My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-08-20_REVISION - C1996083
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1996083
>
2013-08-20_REVISION - C1996083
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:24:00 PM
Creation date
8/23/2013 7:41:59 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Revision
Doc Date
8/20/2013
Doc Name
Adequacy Review - Geotechnical
From
Marcia Talvitie
To
Susan Burgmaier
Type & Sequence
TR80
Email Name
MLT
SB1
SLB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Susan Burgmaier <br />C- 1996 -083 / TR -80 <br />20- Aug -2013 <br />Page 2 of 2 <br />whether use of filter fabric is also proposed for this wide and tapering upper segment of the <br />drain. Please clarify whether a filter fabric is proposed for that portion of the system. <br />The first paragraph on Page 7 provides an estimate of the flow rate through the subdrain, and <br />argues that the cross section provided, together with a 4" perforated pipe, will have sufficient <br />flow capacity for any seepage that might occur from the Fire Mountain Canal. I concur with this <br />analysis, but I do have one comment: the text does not describe where the discharge from the <br />drain will go. Based on Map 21 -1, it appears that the drain pipe may outlet into ditch D -J3. <br />Please review, and revise the text to address this question. <br />4. On revised Map 21 -1 Sheet 1, a typical section of the proposed subdrain is provided in the lower <br />right -hand corner. Please provide a note indicating the type of material composing the rock <br />drain. (The text states it will be %" screened or washed rock.) <br />With this application, no revisions to Volume XI Figure 1 have been proposed. I would like to <br />request that the location of the subdrainage system be added to this map. <br />6. 1 have two additional comments regarding Volume XI Figure 1 of the permit: <br />a) In comparing the cross section lines shown in the plan view with the sections drawn, I <br />believe the letters need to be reversed on the map, i.e. D becomes D' and D' becomes <br />D. This switch also holds true for E -E' and F -F'. <br />b) The cross sections show the original ground surface and the proposed ground surface. <br />It is my understanding that excavation of topsoil and coverfill material was to take place <br />from within the footprint(s) of the pile(s). The limits of the excavation have not been <br />provided on this map, and should rightfully be incorporated. <br />This concludes my preliminary adequacy review of the TR -80 application. Please contact me with any <br />questions you may have. <br />
The URL can be used to link to this page
Your browser does not support the video tag.