Laserfiche WebLink
COST SUMMARY WORK <br />Task description: Technical Revision 74 Cost Summary <br />Site: Elk Creek Mine Permit Action: Technical Revision 74 Permit/Job #: C1981022 <br />PROJECT IDENTIFICATION <br />Task #: 360 State: Colorado <br />Date: 8/8/2013 County: Delta <br />User: BFB <br />Agency or organization name: DRMS <br />TASK LIST (DIRECT COSTS) <br />Abbreviation: None <br />Filename: CO22 -360 <br />Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />361 <br />362 <br />363 <br />364 <br />365 <br />366 <br />367 <br />Plug and Seal 9 Gob Vent Boreholes <br />BOREHOLE <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />36.00 <br />$11,070.46 <br />$4,198.39 <br />$5,597.85 <br />$2,693.35 <br />$3,591.50 <br />$3,849.02 <br />$5,132.02 <br />Regrade Drill Pads <br />DOZER <br />16.83 <br />Regrade Light -Use Roads <br />DOZER <br />22.44 <br />Replace Topsoil from Stockpile to Drill Pads <br />DOZER <br />10.80 <br />Replace Topsoil from Stockpile to Light -Use <br />Roads <br />DOZER <br />14.40 <br />Broadcast Seed Drill Pads <br />REVEGE <br />1.00 <br />Broadcast Seed Light -Use Roads <br />REVEGE <br />1.88 <br />SUBTOTALS: <br />103.35 <br />$36,132.59 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />Liability insurance: <br />2.02% <br />Total = <br />$729.88 <br />Performance bond: <br />1.05% <br />Total = <br />$379.39 <br />Job superintendent: <br />59.50 hrs <br />Total = <br />$3,891.90 <br />Profit: <br />10.00% <br />Total = <br />$3,613.26 <br />TOTAL O & P = <br />$8,614.43 <br />CONTRACT AMOUNT (direct + O & P) = <br />$44,747.02 <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT <br />Financial warranty processing (legal /related costs): <br />0.00 <br />Total = 0.00 <br />Engineering work and /or contractibid preparation: <br />4.61% <br />Total = $2,062.84 <br />Reclamation management and /or administration: <br />3.58% <br />$1,601.94 <br />CONTINGENCY: <br />0.00 <br />Total = $0.00 <br />TOTAL INDIRECT COST = $12,279.21 <br />TOTAL BOND AMOUNT (direct + indirect) = $48,411.80 <br />