My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-08-20_REVISION - C1981018 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981018
>
2013-08-20_REVISION - C1981018 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:23:59 PM
Creation date
8/22/2013 1:46:53 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018
IBM Index Class Name
Revision
Doc Date
8/20/2013
Doc Name
Cost Estimate
From
DRMS
To
Blue Mountain Energy, Inc
Type & Sequence
MR156
Email Name
ZTT
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COST SUMMARY WORK <br />Task description: Reclaim 4 Exploration, 5 N2 and 5 Degas Boreholes <br />Site: Deserado Mine Permit Action: MR156 Permit /Job #: C1981018 <br />PROJECT IDENTIFICATION <br />Task #: 000 State: Colorado <br />Date: 8/7/2013 County: Rio Blanco <br />User: ZTT <br />Agency or organization name: DRMS <br />TASK LIST (DIRECT COSTS) <br />Abbreviation: None <br />Filename: C018 -000 <br />Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />001 <br />002 <br />003 <br />004 <br />005 <br />006 <br />007 <br />Plug and Seal 4 Exploration, 5 N2 and 5 Degas <br />Boreholes <br />BOREHOLE <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />12.00 <br />$8,220.26 <br />$3,544.64 <br />$2,479.04 <br />$2,207.13 <br />$1,540.69 <br />$4,524.10 <br />$4,136.19 <br />Regrade Fourteen Drill Pads <br />DOZER <br />14.21 <br />Regrade Light -Use Roads <br />DOZER <br />9.94 <br />Replace Topsoil to Fourteen Drill Pads <br />DOZER <br />8.85 <br />Replace Topsoil to Light -Use Roads <br />DOZER <br />6.18 <br />Demolish 3" N2 pipe <br />DEMOLISH <br />24.00 <br />Reseed Fourteen Dill Pads and Associated Roads <br />REVEGE <br />14.44 <br />SUBTOTALS: <br />89.62 <br />$26,652.05 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT <br />Liability insurance: 2.02% <br />Total = <br />$538.37 <br />Performance bond: 1.05% <br />Total = <br />$279.85 <br />Job superintendent: 23.36 hrs <br />Total = <br />$1,527.98 <br />Profit: 10.00% <br />Total = <br />$2,665.21 <br />TOTAL O & P = <br />$5,011.41 <br />CONTRACT <br />AMOUNT (direct + O & P) = <br />$31,663.46 <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal/related costs): <br />0.00 Total = <br />0.00 <br />Engineering work and /or contract/bid preparation: <br />4.25% Total = <br />$1,345.70 <br />Reclamation management and /or administration: <br />5.00% <br />$1,583.17 <br />CONTINGENCY: <br />0.00 Total = <br />$0.00 <br />TOTAL INDIRECT COST = <br />$7,940.28 <br />TOTAL BOND AMOUNT (direct + indirect) = <br />$34,592.33 <br />
The URL can be used to link to this page
Your browser does not support the video tag.