Laserfiche WebLink
COST SUMMARY WORK <br />Task description: X- 2013 - 230 -04 Summary of Tasks <br />Site: Deserado Exploration 2013 Permit Action: X- 2013 - 230 -04 Permit /Job #: X201323004 <br />PROJECT IDENTIFICATION <br />Task #: 000 State: Colorado <br />Date: 8/20/2013 County: Rio Blanco <br />User: JDM <br />Agency or organization name: DRMS <br />TASK LIST (DIRECT COSTS) <br />Abbreviation: None <br />Filename: X230 -000 <br />Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />001 <br />002 <br />003 <br />004 <br />005 <br />006 <br />Plug and Seal 10 Exploration Drillholes <br />BOREHOLE <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />38.00 <br />$14,011.94 <br />$2,722.28 <br />$2,483.29 <br />$1,370.75 <br />$3,723.26 <br />$2,234.14 <br />Backfill and Regrade Drill Pads and Mud Pits <br />DOZER <br />13.32 <br />Backfill and Regrade Access Roads <br />DOZER <br />12.15 <br />Replace Topsoil on Drill Pads and Access Roads <br />DOZER <br />6.70 <br />Revegetation of Drill Pads and Access Roads <br />REVEGE <br />8.80 <br />Mob/Demobilize Equipment from Rangely <br />MOBILIZE <br />4.50 <br />SUBTOTALS: <br />83.47 <br />$26,545.66 <br />INDIRECT COSTS <br />6 10 a . � : I W-11 17_,I ►1 Ul i C . Z e 7 011 <br />Liability insurance: 2.02% <br />Total = <br />$536.22 <br />Performance bond: 1.05% <br />Total = <br />$278.73 <br />Job superintendent: 41.73 hrs <br />Total = <br />$2,729.56 <br />Profit: 10.00% <br />Total = <br />$2,654.57 <br />TOTAL O & P = <br />$6,199.08 <br />CONTRACT <br />AMOUNT (direct + O & P) = <br />$32,744.74 <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal/related costs): <br />0.00 Total = <br />0.00 <br />Engineering work and /or contract/bid preparation: <br />4.25% Total = <br />$1,391.65 <br />Reclamation management and /or administration: <br />5.00% <br />$1,637.24 <br />CONTINGENCY: <br />0.00 Total = <br />$0.00 <br />TOTAL INDIRECT COST = <br />$9,227.97 <br />TOTAL BOND AMOUNT (direct + indirect) = <br />$35,773.63 <br />