Laserfiche WebLink
*4T Colorado Alabaster Supply <br />s <br />_. lin" <br />y, <br />A — Current & projected working area <br />B — Soil Stockpile <br />C —Waste Stockpile <br />D — Dig Area <br />E — Product Stockpile <br />F — Direction in which mineral extraction will proceed <br />G — Permit Sign <br />H — Existing ranch road <br />Reclamation Plan <br />CAS Quarry Reclamation Plan Map <br />Permit #M -89 -077 <br />12, August 2013 <br />;r IL <br />r <br />E <br />Each year after quarrying, we will smooth down areas that we no longer need for operation purposes into a gentle <br />slope, in general these slopes will be 4:1 or less. In our operation we will backfill the deposit to protect it from cracking <br />and weathering. These backfilled areas are steeper, approx. 3:1. We will then cover the area that is no longer needed <br />with the stockpiled soil at 12 " -14 ". Vegetation will be seeded according to the recommendation of the Soil <br />Conservation Service as outlined in our original reclamation plan. <br />2010 — Activity in the area within the area between "B, D, & E" <br />2011 — No activity due to weather and scheduling issues. <br />2012 — Activity in the area within the area between "B, D, & E September 27th and 29th <br />2013 — Activity planned for late September, possibly early October, again in the same area as 2012. <br />