Laserfiche WebLink
7450 RECLAIMED SURFACE (PERMITTED) <br /> �-- ' <br /> OPERATIONAL SURFACE <br /> ORIGINAL SURFACE-------_ 3.0 \_ <br /> AS-B T SURFACE (RECLAIMED) <br /> i � <br /> 7400 RECEIVED <br /> FAN LEVEL MAR 14 2012 <br /> Division of RQdamatipn, <br /> Mining and Safety <br /> SECTION 3-C <br /> SCALE 1" = 20' H&V <br /> NOTES, SECTION 3-C <br /> 1.SLOPE SURFACE OF DIVERSION CHANNEL <br /> BACKFILL TO 2HAV OR FLATTER. <br /> 2.SPREAD TOPSOIL ON THE SURFACE OF SLOPE <br /> AND REVEGETATE. <br /> 3.PLACE THE FILL IN APPROXIMATELY HORIZONTAL <br /> LAYERS NO MORE THAN 24 INCHES IN THICKNESS <br /> BY ROUTING THE CONSTRUCTION EQUIPMENT O 7% D '�► <br /> UNIFORMLY OVER THE FILL SURFACE. PREPARED FOR ♦V�.• ••••• PROJECT BOWIE NO. 1 MINE <br /> 4.COMPACTED FILL SHALL HAVE A DRY DENSITY 6 �. N IN TI IC N <br /> BO�YIE RESOURCES L9D+ T T E <br /> OF AT LEAST 90% OF THE MAXIMUM DRY DENSITY. �e� y certify drawing was done <br /> 5.STABILITY ANALYSIS ARE PRESENTED IN DETAIL IN GEO-HYDRO D BOWIE NO. 1 MIN: t he or under . 1re�t supervision and WOE RECLAIMED CONFIGURATIONS <br /> P.O. BOX 148 rat a4g2� in onm�t�n presented on <br /> REPORT, VOLUME 6, OF THE PERMIT. S <br /> ernne RESOURCES, �>D. PAONIA, COLORADO 8142!1 l�is drawing /s tru and correct to the ZONE 3-C <br /> % st of rn 4know 47nd belief. �L4 TIt <br /> PREPARED BY: FJrL ONE I NCH DESIGNED BY: L.K.J. 03/24/97 DRMS I.D.No. DWG.NAME. <br /> REVISED By T.K.B. 03/07/12 ate C-1981-038 c A C DRAWN BY. SCALE 6A-5K <br /> 04/16/98 07/10/01 �&r 1w o CHECKED BY AS SHOWN <br />