My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-04-15_PERMIT FILE - C1981038 (8)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981038
>
2013-04-15_PERMIT FILE - C1981038 (8)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:19:30 PM
Creation date
8/19/2013 1:12:29 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038
IBM Index Class Name
Permit File
Doc Date
4/15/2013
Doc Name
RECLAIMED CONFIGURATIONS ZONE 3-A AND 3-B
Section_Exhibit Name
MAP 6A-5J
Media Type
M
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OPERATIONAL SURFACE <br /> RECLAIMED SURFACE (PERMITTED) <br /> �1 NOTES, SECTION 3-A <br /> ORIGINAL SURFACE----, j 1.9 1. SLOPE SURFACE OF DIVERSION CHANNEL <br /> 7400 BACKFILL TO THE APPROXIMATE ORIGINAL SLOPE. <br /> 2. SPREAD TOPSOIL ON THE SURFACE OF SLOPE <br /> 1.6 AS-BUILT SURFACE (RECLAIMED) AND REVEGETATE. <br /> - 1 3. PLACE THE FILL IN APPROXIMATELY HORIZONTAL <br /> LAYERS NO MORE THAN 24 INCHES IN THICKNESS <br /> BY ROUTING THE CONSTRUCTION EQUIPMENT <br /> UNIFORMLY OVER THE FILL SURFACE. <br /> DIVERSION CHANNEL 4. COMPACTED FILL SHALL HAVE A DRY DENSITY <br /> OF AT LEAST 90% OF THE MAXIMUM DRY DENSITY. <br /> SECTION 3-A <br /> SCALE 1" = 20' H&V <br /> RECEIVED <br /> MAR I i 2012 <br /> OPERATIONAL SURFACE NOTES, SECTION 3-B Division of keciamation, <br /> 7400 Mining and Safety <br /> ORIGINAL SURFACE—� <br /> RECLAIMED SURFACE (PERMITTED) �� 1. SLOPE SURFACE OF DIVERSION CHANNEL <br /> - - - BACKFILL TO 3H:1V OR FLATTER. <br /> 5.3 2. SPREAD TOPSOIL ON THE SURFACE OF SLOPE <br /> AND REVEGETATE. <br /> - 3. PLACE THE FILL IN APPROXIMATELY HORIZONTAL <br /> 1 AS-BUILT SURFACE (RECLAIMED) LAYERS NO MORE THAN 24 INCHES IN THICKNESS <br /> BY ROUTING THE CONSTRUCTION EQUIPMENT <br /> UNIFORMLY OVER THE FILL SURFACE. <br /> 4. COMPACTED FILL SHALL HAVE A DRY DENSITY <br /> -- DIVERSION CHANNEL OF AT LEAST 90% OF THE MAXIMUM DRY DENSITY. <br /> SECTION 3-13 <br /> SCALE 1" = 20' H&V <br /> 00/S5 <br /> P .••••. <br /> PREPARED FOR. • J' ♦ PROJECT: <br /> EN 1 k ` <br /> ° �d TIFICA11ON N BOWIE NO. 1 MINE <br /> p D BO11IE RESOURCES, <br /> ierebx,��r,,((ify ftb°f drawing was done TITLE <br /> p BOWIE NO. 1 MIIN* by ml der mC Ir ct supervision and W E RECLAIMED CONFIGURATIONS <br /> P.O. BOX 144@8 that all of the inftr*`tion presented on <br /> BOWIE RESOURCES, LM. PAONIA, COLORADO 814�8q '�(ris drawing is bt,*nd correct to the S ZONE 3-A & ZONE -B <br /> • t pf my krN1b and belief. <br /> PvFr'n1=D BY ♦ � • I ONE INCH I S +� 4-CI .+ <br /> )YER & ASSOA: .,,:.: c •AQ �� <br /> DESIGNED BV: L.K.J. 03/24/97 DRMS I.D.D No D'NG.NAME: <br /> sz N. with street, unit B • Date C-1981 -038 G�t <br /> REVISED BY: TKB 03/07/12 Jet, CO m: COIOra� .� 19230 DRAWN BY SCALE: 6A-5J <br /> CHECKED BY. 04/16/98 07/10/01 --- —� � CHECKED BY AS SHOWN <br />
The URL can be used to link to this page
Your browser does not support the video tag.