Laserfiche WebLink
Cost Summary Worksheet Cont'd Task # 001 Page 9 of 118 <br />BULLDOZER RIPPING WORK <br />Task description: Rip Roads <br />Site: Bowie No. 1 Mine Permit Action: Bond Release 4 (SL -4) Permit/Job #: C1981038 <br />PROJECT IDENTIFICATION <br />Task #: 041 State: Colorado <br />Date: 3/8/2013 County: Delta <br />User: BFB <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Abbreviation: None <br />Filename: C038 -041 <br />Basic Machine: Cat D10T - lOSU <br />Horsepower: <br />574 <br />Ripper Attachment: 3 -Shank Ripper <br />Shift Basis: <br />1 per day <br />Data Source: <br />(CRG) <br />Cost Breakdown: <br />Utilization % <br />Ownership Cost/Hour: <br />$110.73 <br />NA <br />Operating Cost /Hour: <br />$183.36 <br />100 <br />Ripper Operating Cost/Hour: <br />$10.01 <br />100 <br />Operator Cost /Hour: <br />$37.41 <br />NA <br />Total Unit Cost/Hour: <br />$341.51 <br />Total Fleet Cost /Hour: <br />$1,366.06 <br />MATERIAL QUANTITIES <br />Selected estimating method: Area <br />Alternate Methods: <br />Seismic: NA Bank Volume: <br />NA <br />BCY <br />NA <br />Area: 0.55 acres Rip Depth (ft): 2.00 <br />Volume: 1,775 <br />BCY or CCY <br />Source of estimated quantity: <br />Map 8 -1 <br />HOURLY PRODUCTION <br />Seismic: <br />Seismic Velocity: <br />NA <br />feet/second <br />.Area: <br />Average Ripping Depth: <br />2.87 <br />mph <br />Average Ripping Width: <br />8.67 <br />degrees <br />Average Ripping Length: <br />200.00 <br />feet <br />Average Dozer Speed: <br />88.00 <br />feet <br />Average Maneuver Time: <br />0.25 <br />feet <br />Production per unit area: <br />0.947 <br />acres/hour <br />Job Condition Correction Factors <br />Unadjusted Hourly Unit Production: <br />0.947 <br />Acres/hr <br />Site Altitude: <br />7,000 <br />feet <br />Altitude Adj: <br />1.00 <br />(CAT HB) <br />Job Efficiency: <br />0.83 <br />(1 shift /day) <br />Net Correction: <br />0.83 <br />multiplier <br />Adjusted Hourly Unit Production: <br />0.79 <br />Acres/hr <br />Adjusted Hourly Fleet Production: <br />3.14 <br />Acres/hr <br />JOB TIME AND COST <br />Fleet size: 4 Grader(s) <br />Total job time: <br />0.17 <br />Hours <br />Unit cost: $434.593 Per acre <br />Total job cost: <br />$239.00 <br />CIRCES Cost Estimating Software <br />