Laserfiche WebLink
Cost Summary Worksheet Cont'd Task # 001 Page 5 of 118 <br />Dozing method: <br />Visibility: <br />Job efficiency: <br />Spoil pile: <br />Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type: <br />1.000 <br />(GEN.) <br />1.000 <br />(AVG.) <br />0.830 <br />(1 SHIFT/DAY) <br />0.800 <br />(FND -RF) <br />0.786 <br />(CAT HB) <br />1.000 <br />(CAT HB) <br />0.793 <br />(CAT HB) <br />1.000 <br />(PAT) <br />Net correction: 0.3794 <br />Adjusted unit production: 138.95 LCY;hr <br />Adjusted fleet production: 555.8 LCY r <br />JOB TI.ME AND COST <br />Fleet size: 4 Dozer(s) <br />Unit cost: $2.458 /LCY <br />Total job time: <br />Total job cost: <br />24.10 Hours <br />$32,928.72 <br />CIRCES Cost Estimating Software <br />