Laserfiche WebLink
Cost Summary Worksheet Cont'd Task # 001 Page 25 of 118 <br />Dozing method: <br />Visibility: <br />Job efficiency: <br />Spoil pile: <br />Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type: <br />1.000 <br />(GEN.) <br />1.000 <br />(AVG.) <br />0.830 <br />(1 SHIFT /DAY) <br />0.800 <br />(FND -RF) <br />1.115 <br />(CAT HB) <br />1.000 <br />(CAT HB) <br />0.793 <br />(CAT HB) <br />1.000 <br />(PAT) <br />Net correction: 0.3963 <br />Adjusted unit production: 681.20 LCY / hr <br />Adjusted fleet production: 2724.8 LCY/hr <br />JOB TIME AND COST <br />Fleet size: 4 Dozer(s) <br />Unit cost: 50.501 /LCY <br />Total job time: 0.55 Hours <br />Total job cost: $752.80 <br />CIRCES Cost Estimating Software <br />