Laserfiche WebLink
Cost Summary Worksheet Cont'd Task # 001 Page 23 of 118 <br />Task description: <br />Site: Bowie No. 1 Mine <br />HYDRAULIC EXCAVATOR WORK <br />Establish Irrigation Ditch at Storage <br />Permit Action: Bond Release 4 (SL -4) Permit/Job #: C1981038 <br />PROJECT IDENTIFICATION <br />Task #: 079 State: Colorado <br />Date: 12/19/2012 County: Delta <br />User: BFB <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine. Cat 336D L 10' -6" Stick <br />Attachment 1: ROPS Cab <br />Cost Breakdown: <br />Abbreviation: None <br />Filename: C038 -079 <br />Horsepower: <br />268 <br />Weight (MT): <br />29.30 <br />Shift Basis: <br />1 per day <br />Data Source: <br />(CRG) <br />Basic Job Condition Description: <br />Secondary Job Condition within Basic Description: <br />Cycle Time Value: <br />Load Bucket Capacity <br />Rated Capacity: <br />Bucket Fill Factor: <br />Adjusted Capacity: <br />Job Condition Correction Factors <br />2.26 <br />0.850 <br />1.92 <br />1.330 <br />SEVERE <br />SEVERE <br />0.445 <br />minutes <br />Bucket Size Class: Medium <br />LCY (heaped) <br />Hard, tough clay (80% - 90 %) 0.850 <br />LCY <br />Source <br />Altitude Adj: 1.00 (CAT HB) <br />Job Efficiency: 0.83 (1 shift/day) <br />Net Correction: 0.83 multiplier <br />Unadjusted Hourly Unit Production: 259.01 <br />Adjusted Hourly Unit Production: 214.98 <br />Adjusted Hourly Fleet Production: 214.98 <br />JOB TIME AND COST <br />Fleet size: 1 Excavator Total job time: <br />Site Altitude: 7000 feet <br />LCY/Hour <br />LCY/Hour <br />LCY/Hour <br />1.70 Hours <br />Unit cost: $0.724 /LCY Total job cost: $265.00 <br />CIRCES Cost Estimating Sofivare <br />Utilization % <br />Ownership Cost /Hour: $42.57 <br />NA <br />Operating CostlHour: $79.15 <br />100 <br />Operator Cost/Hour: $33.94 <br />NA <br />Total Unit Cost/Hour: $155.66 <br />Total Fleet Cost/Hour: $155.66 <br />MATERIAL QUANTITIES <br />Initial volume: 275 CCY <br />Swell factor: <br />Loose volume: 366 LCY <br />Source of estimated volume: 1998 Operator <br />Estimate <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Excavator Cvcic Time (load bucket, swing loaded, dump <br />bucket, swing empty): <br />Basic Job Condition Description: <br />Secondary Job Condition within Basic Description: <br />Cycle Time Value: <br />Load Bucket Capacity <br />Rated Capacity: <br />Bucket Fill Factor: <br />Adjusted Capacity: <br />Job Condition Correction Factors <br />2.26 <br />0.850 <br />1.92 <br />1.330 <br />SEVERE <br />SEVERE <br />0.445 <br />minutes <br />Bucket Size Class: Medium <br />LCY (heaped) <br />Hard, tough clay (80% - 90 %) 0.850 <br />LCY <br />Source <br />Altitude Adj: 1.00 (CAT HB) <br />Job Efficiency: 0.83 (1 shift/day) <br />Net Correction: 0.83 multiplier <br />Unadjusted Hourly Unit Production: 259.01 <br />Adjusted Hourly Unit Production: 214.98 <br />Adjusted Hourly Fleet Production: 214.98 <br />JOB TIME AND COST <br />Fleet size: 1 Excavator Total job time: <br />Site Altitude: 7000 feet <br />LCY/Hour <br />LCY/Hour <br />LCY/Hour <br />1.70 Hours <br />Unit cost: $0.724 /LCY Total job cost: $265.00 <br />CIRCES Cost Estimating Sofivare <br />