Laserfiche WebLink
Cost Summary Worksheet Cont'd Task # 001 Page 17 of 118 <br />Dozing method: <br />Visibility: <br />Job efficiency: <br />Spoil pile: <br />Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type: <br />1.000 <br />(GEN.) <br />1.000 <br />(AVG. ) <br />0.830 <br />(1 SHIFT/DAY) <br />0.800 <br />(FND -RF) <br />0.903 <br />(CAT HB) <br />1.000 <br />(CAT HB) <br />0.793 <br />(CAT HB) <br />1.000 <br />(PAT) <br />Net correction: 0.3209 <br />Adjusted unit production: 303.57 LCY.hr <br />Adjusted tleet production: 1214.28 LCY/hr <br />JOB TLME AND COST <br />Fleet size: 4 Dozer(s) <br />Unit cost: $1.125 /LCY <br />Total job time: <br />Total job cost: <br />18.82 Hours <br />$25,706.15 <br />CIRCES Cost Estimating Software <br />