Laserfiche WebLink
Cost Summary Worksheet Cont'd Task # 001 Page I I of 118 <br />Cycle Time: <br />Haul Distance (Ft) Grade Roll. Res <br />Total Res <br />(% <br />Scraper Loading Time: <br />Travel Time <br />(min) <br />1.00 Minutes <br />Maneuver and Spread Time: <br />8.00 <br />0.60 Minutes <br />Job Condition Correction: <br />2972 <br />0.89 <br />Adjusted multiple scraper team (fleet) hourly production: <br />Scraper <br />Push Dozer Source <br />Altitude Adj: <br />1.000 <br />NA (CAT H$) <br />Job Efficiency: <br />0.830 <br />NA (CAT HB) <br />Net Correction: <br />0.830 <br />NA <br />Site Altitude: 7100 feet <br />Travel Time: <br />Road Condition: Firm, smooth, rolling, dirt/It. surfaced, watered, maintained 3.0 <br />Haul Route: <br />Seg # <br />Haul Distance (Ft) Grade Roll. Res <br />Total Res <br />(% <br />Velocity (fpm) <br />Travel Time <br />(min) <br />1 <br />2500.00 5.00 3.00 <br />8.00 <br />1131 <br />2.26 <br />Haul Time: 2.26 minutes <br />Rehirn Rrnife- <br />Seg # <br />Haul Distance (Ft) Grade <br />Roll. Res <br />(% <br />Total Res <br />% <br />Velocity (fpm) <br />Travel Time <br />(min) <br />1 <br />2500.00 -5.00 <br />3.00 <br />-2.00 <br />2972 <br />0.89 <br />Return Time: 0.89 minutes <br />Total Scraper team cycle time: <br />4.75 <br />minutes <br />Adjusted for job conditions: <br />608.08 <br />LCY/Hour <br />Selected Number of Scrapers: <br />2 <br />Scraper(s) <br />Adjusted single scraper team (unit) hourly production: <br />608.08 <br />LCY/Hour <br />Adjusted multiple scraper team (fleet) hourly production: <br />608.08 <br />LCY/Hour <br />Unadjusted unit production/hour: 732.63 LCY /Hour <br />Optimal Number of Scrapers per push dozer: <br />JOB TIME AND COST <br />Fleet size: l Team(s) <br />Total job time: 2.19 Hours <br />Unit cost: $1.392 /LCY Total job cost: S1,853.14 <br />CIRCES Cost Estimating Software <br />