My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-08-19_REVISION - C2009087
DRMS
>
Day Forward
>
Revision
>
Coal
>
C2009087
>
2013-08-19_REVISION - C2009087
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:23:54 PM
Creation date
8/19/2013 9:31:40 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2009087
IBM Index Class Name
Revision
Doc Date
8/19/2013
Doc Name
Adequacy Review
From
DRMS
To
Peabody Sage Creek Mining, LLC
Type & Sequence
TR7
Email Name
JDM
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF COLORADO <br />DIVISION OF RECLAMATION, MINING AND SAFETY <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />Phone: (303) 866 -3567 <br />FAX: (303) 832 -8106 <br />August 19, 2012 <br />B. Scott Cowman <br />Peabody Sage Creek Mining LLC <br />P.O. Box 250 <br />36600 Routt County Road 27 <br />Hayden, CO 81639 -0250 <br />Re: Peabody Sage Creek Mine (Permit No. C- 2009 -087) <br />Technical Revision No. 7 (TR- 7) <br />Adequacy Review <br />Dear Mr. Cowman: <br />COLORADO <br />ID IV I S I O N O F <br />RECLAMATION <br />MINING <br />SAFETY <br />John W. Hickenlooper <br />Governor <br />Mike King <br />Executive Director <br />Loretta E. Pineda <br />Director <br />The Division received Peabody Sage Creek Mining's (SCC) application for a technical revision <br />(TR -07) on July 15, 2013. The application was determined to be complete on July 23, 2013. As <br />of the date of this letter, no concerns have been received from other agencies regarding this <br />proposed technical revision. The Colorado Division of Reclamation, Mining and Safety has <br />completed its adequacy review of the proposed technical revision. Please respond to the <br />following comments or concerns as necessary: <br />Revised page 2.05 -25 omits information required and approved on approved page 2.05- <br />25. Please revise the proposed text to include the information on approved page <br />2.05 -25. <br />2. The revisions associated with the relocation and addition of ditches and culverts proposed <br />in TR -7 and delineated on Map M- 2.05.3 -M4 are not identified in the same location on <br />proposed Map M- 2.05.3 -MIA. Please revise the appropriate proposed Map to <br />identify the correct revised location of ditches and culverts on all required maps. <br />Proposed Table 2.05.3 -E2 -11 on proposed page 2.05.3 -E2.23 lists culvert SC -18. The <br />Division understands that based on the information proposed in TR -7, culvert SC -18 is to <br />be removed due to the relocation of the substation pad access road and the addition of <br />culvert SC -30. If it is the intention of PSCM to remove SC -18, please revise Table <br />2.05.3 -E2 -11 to label culvert SC -18 as removed or remove the culvert from the table. <br />Office of Office of <br />Mined Land Reclamation Denver • Grand Junction • Durango Active and Inactive Mines <br />
The URL can be used to link to this page
Your browser does not support the video tag.