My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-06-07_PERMIT FILE - C2009087
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C2009087
>
2013-06-07_PERMIT FILE - C2009087
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:21:17 PM
Creation date
8/19/2013 9:20:53 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2009087
IBM Index Class Name
Permit File
Doc Date
6/7/2013
Doc Name
Estimated Reclamation Cost
Section_Exhibit Name
Exhibit 3.02.2-E1 Estimated Reclamation Cost
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
129
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 3 of 129 <br />TRUCK/LOADER TEAM WORK <br />Task description: Haul Backfill Material from Coal Handling Facilities to Portal Face -Up <br />Site: Peabody Sage Creek Mine Permit Action: 2013 Midterm Review Permit /Job#: C2009087 <br />PROJECT IDENTIFICATION <br />Task #: 001 State: Colorado <br />Date: 2/4/2013 County: Routt <br />User: JDM <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Truck Loader Team - Truck: Cat 769D <br />- Loader: CAT 988H <br />Support Equipment -Load Area: I Cat D10T - IOSU <br />-Dump Area: I NA <br />Road Maintenance —Motor Grader: NA <br />-Water Trick: Water Tanker. 10.000 Gal. <br />Abbreviation: None <br />Filename: C087 -001 <br />Shift basis: 1 per day <br />Cost Breakdown: Truck/Loader Team Support Eauipment Maintenance Equipment <br />Total work team cost/hour: $1,525.88 <br />MATERIAL OUANTITIES <br />Initial volume: 291.017 <br />Truck <br />Loader Load Area Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization- machine: <br />100 <br />95 100 <br />NA <br />NA <br />25 <br />Ownership cost /hour: <br />$41.57 <br />$82.23 $99.15 <br />NA <br />NA <br />$52.97 <br />Operating cost /hour: <br />$93.68 <br />$111.17 $183.36 NA <br />NA <br />$29.77 <br />Ripper op. cost /hour: <br />NA <br />$0.00 $0.00 NA <br />NA <br />$0.00 <br />Operator cost /hour: <br />$25.66 <br />$35.82 $37.41 NA <br />NA <br />$21.17 <br />Unit Subtotals: <br />$160.90 <br />$229.22 $319.93 NA <br />NA <br />$103.91 <br />Number of Units: <br />4 <br />2 1 0 <br />0 <br />1 <br />Group Subtotals: <br />Work: $1.102.04 Support: $319.93 <br />Maint: $103.91 <br />Total work team cost/hour: $1,525.88 <br />MATERIAL OUANTITIES <br />Initial volume: 291.017 <br />CCY Swell factor: 1.125 <br />Loose volume: 327,394 <br />LCY <br />Source of estimated volume: <br />Division of Reclamation. Mining & Safety <br />Source of estimated swell factor: <br />Cat Handbook <br />Material Purchase Cost: <br />$0.00 <br />Total Cost: <br />$0.00 <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Truck Payload (weight) Basis: <br />Material weight: 2.650 <br />Pounds/LCY <br />Description: Decomposed rock - 25% Rock. 75% Earth <br />Rated Payload: 82.000 <br />Pounds <br />Payload Capacity: 30.94 <br />LCY <br />CIRCES Cost Estimating SORRare <br />
The URL can be used to link to this page
Your browser does not support the video tag.