My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-06-07_PERMIT FILE - C2009087
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C2009087
>
2013-06-07_PERMIT FILE - C2009087
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:21:17 PM
Creation date
8/19/2013 9:20:53 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2009087
IBM Index Class Name
Permit File
Doc Date
6/7/2013
Doc Name
Estimated Reclamation Cost
Section_Exhibit Name
Exhibit 3.02.2-E1 Estimated Reclamation Cost
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
129
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 31 of 129 <br />Haul Route: <br />Seg # <br />Haul Distance <br />Grade ( o <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />minutes <br />(Ft) <br />1 <br />( %) <br />( %) <br />(fpm) <br />4254 <br />2.754 <br />- <br />Truck Unit Production <br />- - <br />- <br />(nun) <br />1 <br />105600) <br />0.00 <br />1.20 <br />L20 <br />4223 <br />3.212 <br />Haul Time: <br />Return Route: <br />3.212 <br />minutes <br />CIRCES Cost Estimating Softy are <br />Seg # <br />Haul Distance <br />(Ft) <br />Grade ( %) <br />Roll. Res Total Res <br />( %) ( %) <br />Velocity <br />(fpm) <br />Travel <br />Time <br />(min) <br />minutes <br />Loading Tool unit <br />1 <br />10560.00 <br />0.00 <br />1.20 1.20 <br />4254 <br />2.754 <br />916.32 LCY/Hour <br />Truck Unit Production <br />211.42 <br />LCY/Hour Adjusted for job efficiency: <br />175.48 LCY/Hour <br />CIRCES Cost Estimating Softy are <br />Return Tune: 2.754 <br />minutes <br />Total Truck Cycle Time: 8.616 <br />minutes <br />Loading Tool unit <br />Production <br />1.104.00 <br />LCY/Hour Adjusted for job efficiency: <br />916.32 LCY/Hour <br />Truck Unit Production <br />211.42 <br />LCY/Hour Adjusted for job efficiency: <br />175.48 LCY/Hour <br />Optimal No. of Trucks: <br />5 <br />Truck(s) Selected Number of Trucks: <br />6 Truck(s) <br />Adjusted hourly truck team production: 1.052.87 <br />LCY/Hour <br />Adjusted single truck/loader team production: 916.32 <br />LCY/Hour <br />Adjusted multiple truck/loader team production: 916.32 <br />LCY/Hour <br />JOB TIME AND COST <br />Fleet size: <br />1 <br />Team(s) Total job time: 3.07 <br />Hours <br />Unit cost: <br />$1.507 <br />/LCY Total job cost: $4,239.92 <br />CIRCES Cost Estimating Softy are <br />
The URL can be used to link to this page
Your browser does not support the video tag.