My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-06-07_PERMIT FILE - C2009087
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C2009087
>
2013-06-07_PERMIT FILE - C2009087
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:21:17 PM
Creation date
8/19/2013 9:20:53 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2009087
IBM Index Class Name
Permit File
Doc Date
6/7/2013
Doc Name
Estimated Reclamation Cost
Section_Exhibit Name
Exhibit 3.02.2-E1 Estimated Reclamation Cost
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
129
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Truck Bed (volume) Basis: <br />Struck Volume: <br />21.60 <br />LCY <br />Heaped Volume: <br />31.70 <br />LCY <br />Average Volume: <br />26.65 <br />LCY <br />Adjusted Volume: <br />31.70 <br />LCY <br />Final Truck Volume Based on Number of Loader Passes: <br />Loading Tool Capacity <br />Rated Capacity: 9.200 <br />Bucket Fill Factor: 1.100 <br />Adjusted Capacity: 10.120 <br />Job Condition Corrections: <br />30.36 LCY <br />Bucket Size Class: NA <br />LCY (heaped) <br />Other - rock/dirt nurtures (100 -1 <br />1.100 <br />Site Altitude (ft.): 6800 feet <br />Net Correction: 1 0.830 1 0.830 1 <br />Loading Tool Cycle Time: Number of Loading Tool Passes Required to Fill Truck: 3 passes <br />Excavators and Front Shovels: <br />Machine Cycle Time vs. Job Condition Rating: NA <br />Selected Value Avithin this Basic Rating: NA <br />Track Loaders — Material Description: <br />Cycle Time Elements (min.): <br />Load: NA Maneuver: NA <br />Dump: 0.100 <br />Wheel and Track Loaders - Unadjusted Basic Loader Cycle Time (load, dump, maneuver): <br />Cycle Time Factors Factor (min.) <br />Truck <br />Loader Source <br />Altitude Ad': <br />1.000 <br />1.000 (CAT HB) <br />Job Effnciencv: <br />0.830 <br />0.830 (CAT HB) <br />Net Correction: 1 0.830 1 0.830 1 <br />Loading Tool Cycle Time: Number of Loading Tool Passes Required to Fill Truck: 3 passes <br />Excavators and Front Shovels: <br />Machine Cycle Time vs. Job Condition Rating: NA <br />Selected Value Avithin this Basic Rating: NA <br />Track Loaders — Material Description: <br />Cycle Time Elements (min.): <br />Load: NA Maneuver: NA <br />Dump: 0.100 <br />Wheel and Track Loaders - Unadjusted Basic Loader Cycle Time (load, dump, maneuver): <br />Cycle Time Factors Factor (min.) <br />0.575 minutes <br />Source <br />Material: <br />Material 1/8" to 3/4" diameter - 0.02 <br />-0.020 <br />Adjusted for site altitude: <br />(Cat HB) <br />Stockpile: <br />Conveyor or dozer piled 10 ft. high and up 0.00 <br />0.000 <br />(Cat HB) <br />Truck Ownership: <br />Common ownership of tricks and loaders -0.04 <br />- 0.0.40 <br />(Cat HB) <br />Operation: <br />Constant operation -0.04 <br />- 0.040 <br />(Cat HB) <br />Dump Target: <br />N_ i_na_l target 0.00 <br />0.000 <br />(Cat HB) <br />_om_ <br />Net Cycle Time Adjustment: <br />-0.100 <br />minutes <br />Adjusted Loader Cycle Time: <br />0.475 <br />minutes <br />Net Load Time per Truck: <br />1.050 <br />minutes <br />Truck Cycle Time: <br />Trick Exchange Time: 0.60 <br />Truck Load Tune: 1.050 <br />Trick Maneuver and Dump Time: 1.00 <br />Truck Travel (Haul & Return) Time: <br />netration 1.2 <br />Minutes <br />Adjusted for site altitude: <br />0.600 <br />Minutes <br />Minutes <br />Adjusted for site altitude: <br />1.050 <br />Minutes <br />Minutes <br />Adjusted for site altitude: <br />1.000 <br />Minutes <br />Road Condition: Vent' hard, smooth, asphalt or concrete, no tire <br />
The URL can be used to link to this page
Your browser does not support the video tag.