Laserfiche WebLink
Visibility: <br />Job efficiency: <br />Spoil pile: <br />Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type: <br />1.000 <br />(AVG.) <br />0.830 <br />(1 SHIFT/DAY) <br />0.800 <br />(FND -RF) <br />1.000 <br />(CAT HB) <br />1.000 <br />(CAT HB) <br />Net correction: 0.3890 <br />0.868 (CAT HB) <br />1.000 (PAT) <br />Adjusted unit production: 544.60 LCY/hr <br />Adjusted fleet production: 544.6 LCY/hr <br />JOB TIME AND COST <br />Fleet size: <br />I Dozer(s) <br />Unit cost: <br />$0.387/LCY <br />Total job time: <br />7.78 Hours <br />Total job cost: <br />$1,640.69 <br />Page 20 of 129 <br />CIRCES Cost Eshmating SOffiNare <br />