Laserfiche WebLink
Job efficiency: <br />0.830 <br />(1 S=/DAY) <br />Spoil pile: <br />0.800 <br />(FND -RF) <br />Push gradient: <br />1.000 <br />(CAT HB) <br />Altitude: <br />1.000 <br />(CAT HB) <br />Material Weight: <br />0.868 i <br />(CAT HB) <br />Blade tv <br />1.000 <br />(PAT) <br />Net correction: 0.4755 <br />Adjusted unit production: 405.41 LCY/hr <br />Adjusted fleet production: 405.41 LCY/hr <br />JOB TIME AND COST <br />Fleet size: 1 Dozer(s) <br />Unit cost: $0.504/LCY <br />Total job tune: 6.94 Hours <br />Total job cost: $1,418.35 <br />Page 18 of 129 <br />CIRCES Cost Estimatutg SotZRare <br />