Laserfiche WebLink
Job efficiency: <br />Spoil pile: <br />Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type: <br />0.830 <br />(1 S=/DAY) <br />0.800 <br />(FND -RF) <br />1.000 <br />(CAT HB) <br />1.000 <br />(CAT HB) <br />0.868 <br />1.000 <br />(CAT HB) <br />(PAT) <br />Net correction: 0.4755 <br />Adjusted unit production: 405.41 LCY/hr <br />Adjusted fleet production: 405.41 LCY/hr <br />JOB TIME AND COST <br />Fleet size: 1 Dozer(s) <br />Unit cost: $0.504/LCY <br />Total job time: <br />Total job cost: <br />46.54 Hours <br />$9 „514.31 <br />Page 16 of 129 <br />CIRCES Cost Estimating Soffixare <br />