Laserfiche WebLink
-4- <br />12. Primary future (Post - mining) land use (check one): <br />Cropland(CR) Pastureland(PL) General Agriculture(GA) <br />7 Rangeland(RL) � Forestry(FR) Wildlife Habitat(WL) <br />ElResidential(RS) Recreation(RC) industrial /Commercial(IC) <br />,l Developed Water Resources(WR) F� Solid Waste Disposal(WD) <br />13. Primary present land use check one): <br />E[ Cropland(CR) Pastureland(PL) General Agriculture(GA) <br />II Rangeland(RL) Forestry(FR) �°''°( Wildlife Habitat(WL) <br />Residential(RS) Recreation(RC) 1�.! Industrial /Commercial(IC) <br />Developed Water Resources(WR) <br />14. Method of Mining: Briefly explain mining method (e.g. truck /shovel): <br />Surface mining will occur with loaders and dozers. <br />15. On Site Processing: • Crushing/Screening <br />13.1 Briefly explain mining method (e.g. truck /shovel): <br />Aggregate will be crushed and sized on site in a portable processing plant. The crusher hopper and trucks loaded with a loader. <br />List any designated chemicals or acid - producing materials to be used or stored within permit area: _ <br />No chemicals or acid - producing materials will be used or stored within the permit area. <br />16. Description of Amendment or Conversion: <br />If you are amending or converting an existing operation, provide a brief narrative describing the proposed change(s). <br />