Laserfiche WebLink
Battle Mountain Resources Inc. <br />San Luis Project <br />CMLRB Permit No. M -88 -112 <br />July 2013 Monthly Report <br />Page 2 <br />Table 1- Jule 2013 Ground Water Monitoring Well and Lysimeter Depth to Water <br />Measurements <br />Monitoring Site <br />Date <br />Depth to Water (feet) <br />M4R <br />7/31/13 <br />0 <br />M -6 <br />7/31/13 <br />Dry <br />M -7 <br />7/31 /13 <br />Dry <br />M -8 <br />7/31/13 <br />Dry <br />M -9 <br />7/31/13 <br />141.97 <br />M -10 <br />7/31/13 <br />26.82 <br />M -11R <br />7/31/13 <br />39.84 <br />M -12 <br />7/31/13 <br />176.28 <br />M -13R <br />7/31/13 <br />127.27 <br />M -14 <br />7/31/13 <br />137.22 <br />M -15 <br />7/31/13 <br />92.82 <br />M -16 <br />7/31/13 <br />22.56 <br />M -19 <br />7/31/13 <br />23.61 <br />M -21 <br />7/31/13 <br />17.58 <br />M -22 <br />7/31/13 <br />15.95 <br />M -26 <br />7/31/13 <br />16.42 <br />M -32 <br />7/31/13 <br />45.01 <br />M -33 <br />7/31/13 <br />47.56 <br />M -34 <br />7/31/13 <br />24.16 <br />BF -4 <br />7/31/13 <br />24.89 <br />BF -6 <br />7/31/13 <br />30.86 <br />LS -1 <br />7/31/13 <br />Dry <br />LS -2 <br />7/31/13 <br />Dry <br />LS -3 <br />7/31/13 <br />Dry <br />LD -1 <br />7/31/13 <br />Dry <br />LD -2 <br />7/31/13 <br />Dama ed <br />LD -3 <br />7/31/13 <br />Dry <br />Table 2 — July 2013 Tailing Disposal Area Piezometer Depth to Water <br />Piezometer Date Depth to Water Total Depth (ft) Volume of <br />(feet) Water (ft) <br />P6 <br />7/31/13 <br />Dm <br />72.46 <br />0.00 <br />P7 <br />7/31/13 <br />92.26 <br />92.50 <br />0.24 <br />P8 <br />7/31/13 <br />96.93 <br />97.51 <br />0.58 <br />P9 <br />7/31/13 <br />71.88 <br />72.30 <br />0.42 <br />