Laserfiche WebLink
Page 2 of 3 <br />112c Annual Report <br />Permittee Name: <br />General Shale Brick, Inc. <br />Permit Number: <br />M- 1979 -221 <br />Operation Name: <br />Ute Mine <br />County: <br />Douglas <br />Annual Fee Due: <br />$791.00 <br />Anniversary Date: <br />August 26, 2013 <br />Permit Acreage: <br />38.78 <br />Current Bond Amt: <br />$39,000.00 <br />According to C.R.S. 34- 32.5 -116 or 34 -32 -116, each year, on the anniversary date of the permit, an operator shall submit <br />the Annual Fee, an Annual Report and Map showing the extent of current disturbances to affected land, required <br />monitoring information, reclamation accomplished to date and during the preceding year, any new disturbance that is <br />anticipated to occur during the upcoming year, any reclamation that will be performed during the upcoming year, the <br />dates for the beginning of active operations, and the date active operations ceased for the year. <br />Information contained in this report will be reviewed by the Division upon receipt and prior to the next compliance <br />inspection of the site. If, while completing this report, you learn that your site is not in compliance with the rules and the <br />act, it is advisable that the issues be rectified promptly to avoid possible enforcement action. <br />1. <br />Is the site identification sign posted in accordance with Rule 3.1.12(1). <br />YES NO <br />2. <br />Is the affected area boundary clearly marked in accordance with Rule 3.1.12(2). <br />YES, NO <br />3. <br />Is the mine site in final reclamation (all material extraction and stockpile removal is complete)? YES NO <br />backfilled: <br />If "YES," please note time limits related to completion of reclamation, Rule 3.1.3. <br />seeded w/ <br />4. <br />What the date last hauling <br />(n` <br />v/ 1� <br />mulched w/ <br />was of excavation, processing or activity at the mine? <br />5. <br />Does the mine operate more than 180 days per year? <br />( — '� NO <br />replaced: <br />If "NO ", please review Rule 1.13 to assure that your mine is in compliance. <br />approved mulch: <br />6. <br />Has this mine been granted: a) approval of TEMPORARY CESSATION Status? <br />YES <br />Total acres <br />b) approval for INTERMITTENT OPERATION? <br />YES NO , <br />7. <br />Number of acres currently affected (mining + incomplete and or unreleased reclamation). <br />I <br />8. <br />Number of acres that were newly affected during the current report <br />fertilized w/ <br />9. <br />ayea��r++E��� <br />Number of acres that were reclaimed during the current report yav <br />rate (tons /ac): <br />AuG Zo� <br />10. <br />Estimated new acreage to be affected in the next report year. <br />I <br />depth (in.): <br />11. <br />QNOF� <br />Estimated acres to be reclaimed in the next report year. � <br />12. <br />Total acres in various stages of reclamation, since permitted minin c ivities began: <br />Mulch <br />Total acres <br />Total acres <br />Total acres <br />Total acres <br />backfilled: <br />H1f�j <br />seeded w/ <br />w /topsoil <br />mulched w/ <br />approved mix: <br />replaced: <br />approved mulch: <br />Total acres <br />Total acres <br />Topsoil <br />Mulch application <br />graded: <br />fertilized w/ <br />replacement <br />rate (tons /ac): <br />apvd fertilizer: <br />I <br />depth (in.): <br />Seed <br />Fertilizer <br />Mulch <br />application <br />application <br />application <br />method: <br />method: <br />method: <br />