My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-08-14_REVISION - C1981019 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2013-08-14_REVISION - C1981019 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:23:48 PM
Creation date
8/14/2013 2:03:09 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
REVISION
Doc Date
8/14/2013
Doc Name
Letter Application and Pubic Notice
From
Colowyo Coal Company
To
DRMS
Type & Sequence
TR100
Email Name
RDZ
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a`O� cojgRr <br />:« $ COLORADO DIVISION OF MINERALS AND GEOLOGY RECEIVE <br />1313 Sherman Street, Room 215, Denver, Colorado 80203, (303) 866 -3567 D <br />AU8 14 013 <br />DMS" OF RECLAMATION <br />APPLICATION FORM FORA REVISION MINING AND SAFETY <br />TO A COAL MINING AND RECLAMATION PERMIT <br />This form must be completed and submitted with all requests for minor revisions, as defined in Rule 1.04(73), <br />technical revisions, as defined in Rule 1.04(136), and permit revisions, as defined in Rule 1.04(90). All revisions <br />are to address the requirements of Rule 2.08.4. Three (3) copies of the revision, including maps, must be <br />submitted in order for it to be complete. <br />All revisions are to be formatted so they can be inserted into the permit to replace the revised sections, maps, <br />tables and /or figures, with a revised table of contents, if necessary. The revision submittal date should be printed <br />in the lower right comer of each revision page. A cover letter to the revision should explain the nature of the <br />revision and reference the specific permit sections being revised. <br />For federal mines, a copy of the revision application must be submitted to all agencies on the federal mailing list <br />(except OSM) at the same time the application is submitted to the Division, and proof of distribution must be <br />submitted to the Division along with the application. Copies of revision pages modified during the review process <br />must be distributed in the same manner, along with proof of distribution. Proof of distribution must be submitted <br />prior to implementation of the revision. <br />Permit No.: C - 1981 - 019 Date: 08 / 07 / 13 <br />Permittee: Colowyo Coal Company, L.P. <br />Street: 5731 State Highway 13 <br />City: Meeker <br />State: CO Zip Code: 81641 _ <br />Brief Description of Revision: TR -100 revised Colowyo's mine plan to <br />propose highwall mining in the West and <br />Sout Taylor Pits. <br />Public Notice Attached: Yes ✓ No _ (Required for PRs and TRs) <br />Bond Increase: Yes No ✓ Federal ✓ Non - Federal Mine <br />Proposed Change in: <br />Permit Area - <br />Disturbed ( + / -) _ _ 0 .0 Acres <br />Permit ( + / -) _ _ 0 .0 Acres <br />Affected ( + / -) _ _ 0 . 0 Acres <br />Mineral Ownership - <br />Mineral Private ( + / -) _ _ 0 0 Acres <br />Mineral Federal ( + / -) _ _ 0 , 0 Acres <br />Surface Ownership - <br />Private Land ( + / -) _ _ 0 . 0 Acres <br />Federal Land ( + / -) _ _ 0 . 0 Acres <br />State Land ( + / -) _ _ 0 . 0 Acres <br />Mineral State ( + / -) _ _ 0 0 Acres <br />
The URL can be used to link to this page
Your browser does not support the video tag.