My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-08-13_REVISION - C1982056
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1982056
>
2013-08-13_REVISION - C1982056
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:23:46 PM
Creation date
8/14/2013 1:22:05 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
Revision
Doc Date
8/13/2013
Doc Name
Adequacy Response Review
From
DRMS
To
Twentymile Coal Company
Type & Sequence
RN6
Email Name
JDM
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cost Summary Worksheet Cont'd Task # 000 Page 5 of 5 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT <br />Liability insurance: 2.02% <br />DRILLHOLE /MONITORING WELL SEALING <br />$158,461.36 <br />Performance bond: 1.05% <br />181 <br />Borehole and Monitoring Well Sealing I BOREHOLE I 1 <br />425.00 <br />$350,200.23 <br />$164,159.48 <br />REVEGETATION and RESEEDING <br />Total = <br />$784,462.18 <br />185 <br />Rangeland Area Seeding; All approved REVEGE 1 <br />273.00 <br />$434,079.21 <br />AMOUNT (direct + O & P) = <br />disturbances <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />STRUCTUAL DEMOLITIONAND REMOVAL <br />Financial warranty processing (legal/related costs): <br />0.00 Total = <br />190 <br />Demolish and Remove All Structures I DEMOLISH 1 <br />4,000.00 <br />$3,034,472.57 <br />Reclamation management and /or administration: <br />MISCELLANEOUS RECLAMATION TASKS <br />$282,766.50 <br />200 <br />Mobilize/Demobilize Equipment from Hayden, MOBILIZE 1 <br />3.37 <br />$32,548.14 <br />Colorado <br />$1,833,580.98 <br />210 <br />Site Maintenance During Reclamation and Ten- SITEMAINT 1 <br />300.00 <br />$90,121.25 <br />Year Liability ENANCE <br />SUBTOTALS: <br />10038.83 <br />$7,844,621.84 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT <br />Liability insurance: 2.02% <br />Total = <br />$158,461.36 <br />Performance bond: 1.05% <br />Total = <br />$82,368.53 <br />Job superintendent: 2,509.70 hrs <br />Total = <br />$164,159.48 <br />Profit: 10.00% <br />Total = <br />$784,462.18 <br />TOTAL O & P = <br />$1,189,451.55 <br />CONTRACT <br />AMOUNT (direct + O & P) = <br />$9,034,073.39 <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal/related costs): <br />0.00 Total = <br />0.00 <br />Engineering work and /or contract/bid preparation: <br />4.00% Total = <br />$361,362.94 <br />Reclamation management and /or administration: <br />3.13% <br />$282,766.50 <br />CONTINGENCY: <br />0.00 Total = <br />$0.00 <br />TOTAL INDIRECT COST = <br />$1,833,580.98 <br />TOTAL BOND AMOUNT (direct + indirect) = <br />$9,678,202.82 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.