Laserfiche WebLink
Q <br />00 <br />M <br />f` <br />N <br />O) <br />Cl) <br />CU <br />U <br />o EXISTING DIVERSION DITCH <br />�o / o / <br />4 <br />`° `� 0 1�0 200 <br />I Uri <br />ham° <br />E �� i� � CO <br />\Z) SCALE. 100' <br />oN CO TOUR IN TE A = 1 FOOT �p <br />- P ,ios °� X851 "¶ o <br />2 z t o u n d a r <br />LO <br />� <br />F. e s <br />— OPOSED DI Exrsr. <br />WA TE7R- ��- -- — <br />PROPOSED CO S I TANK `» — PRO ANE EXISTING OFFSITE BAST 0 <br />4 — E (aC S AD ITCH / / N EXIST. TANK O BYPASS CHANNEL (R AD —DIT ) <br />— OP TION E P G. SHO R <br />j BL G. / <br />— E STI COLLECTI CAN (EX SO �TAL h� <br />— p D CO C AN <br />i d , <br />— TIN C TI CH NEL <br />6 550 Y <br />TING NTION PONDS 6 C j ° �°j '001 c �} <br />— PRO SED COLLECTION BERM /SWA /'/ �� � ,''• �3 ::' ; `�._ <br />/ S SECTION 3II -3 i - <br />1 iY <br />\ P OPOS E55 RO A `9 <br />ORE STOCKP T. 1 Qo <br />— WASTE R K <br />/ OFFSITE �I DUMP <br />BASIN 10 <br />�h <br />v DRAINAGE / <br />el CHANN 1 EbST. <br />> <br />1OA-1 <br />i <br />DRAINA ITCH i N <br />N R <br />DITC P O O '`- = <br />NTS <br />CIST. <br />COLOR ° Off, <br />8" 4 <br />� <br />0*- 12" a 9 d O�n 0 PROPOSED <br />� <br />12" 30" 15" OAS, 00 9 RETENTION <br />12" 8" °cam S� OFF SfTE POND 30 <br />° <br />5' 8" 4 , BASIN 10 <br />s) DRAINAGE <br />1 " A N/A i9 c° CHANNEL <br />2 2 14" O ° <br />1 /A N/A s <br />BO O \ <br />LID <br />m 1C DATE 3/27/20,3 DRAWN RLC DATE 9/25/2012 2350 G Road PROPOSED DRAINAGE IMPROVEMENTS <br />,,,,„® RLD �� 8/1/2013 DESIGNED aY Pra DATE 9/25/2012 O'Connor 1�eszyn Group, Inc. GPhoneU(9710)241-7125 8 5 DRAINAGE DESIGN PLAN REVISION ®_ DATE CHECKED BY PMO DATE 9/25/2012 +� -F Fax: (970) 241 -7852 COTTER CORPORATION MINE JD -9 sHEEI 3 01 10 <br />