My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-08-12_REVISION - C1981014
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981014
>
2013-08-12_REVISION - C1981014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:23:42 PM
Creation date
8/12/2013 1:30:30 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981014
IBM Index Class Name
Revision
Doc Date
8/12/2013
Doc Name
Letter regarding Reschedule MLRB Board Hearing
From
Energy Fuels Coal Inc
To
DRMS
Type & Sequence
TR40
Email Name
JHB
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
energy fuels coal, inc. <br />southfield mine • post office box 459 • florence. colorado 81226 • (719) 784 -6395 <br />August 1, 2013 <br />Ms. Janet Binns — Reclamation Specialist <br />Colorado Division of Reclamation Mining & Safety <br />1313 Sherman St — Room 215 <br />Denver, CO 80203 <br />RECEIVED , <br />AUG 122013 <br />SON OF RECLAMATION <br />MOW AND SAFETY <br />RE: Technical Revision No.40 (TR -40) - Southfield Monitor Well MW -NW <br />Energy Fuels Coal, Inc. — Permit No. C -81 -014 — Southfield Mine <br />Dear Janet Binns: <br />As a result of obtaining additional hydrologic information and support data pertaining to the monitor well <br />MW -NW in the context of the Southfield mine's hydrogeology, EFCI submitted a revised version of <br />Technical Revision No. 40 (TR -40) on July 25, 2013 to the Division. The TR was filed in response to <br />NOV No. CV- 2013 -002 which sited EFCI for failing to ensure that monitoring well MW -NW continued <br />to function as designed. The NOV is currently on appeal to the Mined Land Reclamation Board (the <br />"Board "). <br />Given that the research, modeling data and support material submitted in TR -40 is quite extensive, EFCI <br />understands that the Division requires adequate time to review, evaluate and respond to the Revision in a <br />reasonable time frame. <br />Accordingly, EFCI requests that the scheduled Mined Land Reclamation Board Hearing currently <br />scheduled for August 14, 2013, be postponed and rescheduled for the October 16, 2013 Board Hearing <br />date. <br />If you have questions or require further information, please contact me. <br />Sincerely, <br />eorge V Patterson <br />Energy Fuels Coal, Inc <br />
The URL can be used to link to this page
Your browser does not support the video tag.