My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-08-09_REVISION - C1981018
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981018
>
2013-08-09_REVISION - C1981018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:23:40 PM
Creation date
8/9/2013 10:47:57 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018
IBM Index Class Name
Revision
Doc Date
8/9/2013
Doc Name
Adequacy Review & Cost Estimate
From
DRMS
To
Blue Mountain Energy, Inc
Type & Sequence
MR156
Email Name
ZTT
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COST SUMMARY WORK <br />Task description: Reclaim RS -11L, 5 N2 and 5 Degas Boreholes <br />Site: Deserado Mine Permit Action: MR156 Permit/Job #: C1981018 <br />PROJECT IDENTIFICATION <br />Task #: 000 State: Colorado <br />Date: 8/7/2013 County: Rio Blanco <br />User: ZTT <br />Agency or organization name: DRMS <br />TASK LIST (DIRECT COSTS) <br />Abbreviation: None <br />Filename: C018 -000 <br />Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />001 <br />002 <br />003 <br />004 <br />005 <br />006 <br />007 <br />008 <br />009 <br />Plug and Seal RS -11L, 5 N2 Boreholes and 5 <br />Degas Boreholes <br />BOREHOLE <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />12.00 <br />$6,960.04 <br />$1,511.61 <br />$2,705.12 <br />$309.88 <br />$361.42 <br />$1,267.25 <br />$277.73 <br />$2,589.42 <br />$4,524.10 <br />Re grade Drill Pad RS -11L <br />DOZER <br />6.06 <br />Re grade Ten Drill Pads <br />DOZER <br />10.85 <br />Re grade Light-Use Roads <br />DOZER <br />1.24 <br />Replace Topsoil on Drill Pad RS -I IL <br />DOZER <br />1.82 <br />Replace Topsoil to Ten Drill Pads <br />DOZER <br />5.08 <br />Re lace Topsoil to Light-Use Roads <br />DOZER <br />1.11 <br />Reseed RS -11 L, Ten Dill Pads and Associated <br />Roads <br />REVEGE <br />9.04 <br />Demolish 3" N2 pipe <br />DEMOLISH <br />24.00 <br />SUBTOTALS: <br />71.2 <br />$20,506.57 <br />INDIRECT COSTS <br />CWA0 9:lMIROW ►1.79:Z61aIW <br />Liability insurance: <br />Performance bond: <br />Job superintendent: <br />Profit: <br />2.02% <br />Total = <br />$414.23 <br />1.05% <br />Total = <br />$215.32 <br />23.36 hrs <br />Total = <br />$1,527.98 <br />10.00% <br />Total = <br />$2,050.66 <br />TOTAL O & P = <br />$4,208.19 <br />CONTRACT AMOUNT (direct + O & P) = <br />$24,714.76 <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal/related costs): <br />Engineering work and/or contractibid preparation: <br />Reclamation management and/or administration: <br />0.00 <br />4.25% <br />5.00% <br />CONTINGENCY: 0.00 <br />Total = 0.00 <br />Total = $1,050.38 <br />$1,235.74 <br />Total = $0.00 <br />TOTAL INDIRECT COST = $6,494.31 <br />TOTAL BOND AMOUNT (direct + indirect) = $27,000.88 <br />
The URL can be used to link to this page
Your browser does not support the video tag.