Laserfiche WebLink
Page 1 of 2 <br />BULLDOZER WORK <br />Task description: Replace Topsoil to Ten Drill Pads <br />Site: Deserado Mine Permit Action: MR156 Permit/Job #: C1981018 <br />PROJECT IDENTIFICATION <br />Task #: 006 <br />Date: 8/8/2013 <br />User: ZTT <br />State: Colorado <br />County: Rio Blanco <br />Agency or organization name <br />HOURLY EOU <br />Basic Machine: <br />Horsepower: <br />Blade Type: <br />Attachment: <br />Shift Basis: <br />Data Source: <br />Cost Breakdown: <br />IPMENT COST <br />Cat D9T - 9SU <br />405 <br />Semi - Universal <br />NA <br />1 per day <br />(CRG) <br />DRMS <br />Abbreviation: None <br />Filename: C018 -006 <br />Total unit Cost/Hour: $249.42 <br />Total Fleet Cost/Hour: $249.42 <br />MATERIAL QUANTITIES <br />Source <br />Utilization % <br />Ownership Cost/Hour: <br />$69.88 <br />NA <br />Operating Cost/Hour: <br />$142.13 <br />100 <br />Ripper op. Cost/Hour: <br />$0.00 <br />0 <br />Operator Cost/Hour: <br />$37.41 <br />NA <br />Total unit Cost/Hour: $249.42 <br />Total Fleet Cost/Hour: $249.42 <br />MATERIAL QUANTITIES <br />Source <br />Initial Volume: <br />3,600 <br />Swell factor: <br />1.250 <br />Loose volume: <br />4,500 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />65 feet <br />1,752.8 LCY/hr <br />Materials consistency description: Compacted fill or embankment 0.9 <br />Average push gradient: <br />Average site altitude: <br />Material weight: <br />Weight description: <br />0% <br />5,800 feet <br />2,550 lbs/LCY <br />Earth - <br />Job Condition Correction Factor <br />Source <br />Operator Skill: 0.750 <br />(AVG.) <br />Material consistency: 0.900 <br />CAT HB <br />Dozing method: 1.000 <br />GEN. <br />CIRCES Cost Estimating Software <br />