Notes for site visit August 6. 2013: <br />I arrived on site about 1:15 and met with Gary Harding who took me around the <br />Gob Pile. Our first stop was Pond C, which has been mostly dewatered, as has Pond <br />D, and B. Pond F is not quite dewatered, they are letting the sediment settle out. <br />In the TR -76 expansion area, a road has now been constructed between the two <br />piles, which makes hiking up to the upper diversion ditches much more pleasant. <br />Gary and I walked along W. Diversion Ditch #1. Some erosion had occurred in the <br />upslope and had slumped into the channel bottom during the rain event on July 28. <br />This type of surficial slumping is to be expected as the up -slope reaches its <br />equilibrium point. But as mentioned in last weeks report, the ditch had been <br />cleaned by Wednesday July 31, 2013, so the channel was in good shape. In last <br />weeks report I mentioned that based on the Surveyor's pictures, the potential need <br />for riprap where W. Diversion Ditch #1 outlets into the ephemeral drainage. But, <br />there was no substantial signs of erosion, so no riprap is needed at this time. The <br />outlet will continue to be monitored after large storm events for evidence of <br />erosion. <br />On the newly constructed road between the two piles, the Operator had begun to <br />haul coverfill to the west side of Gob pile #4. Before the large rain event, it was <br />anticipated that placement of Coverfill would begin on the west side of the pile. <br />However, at this point, no work has begun placing the coverfill material on gob pile <br />#4. <br />Our next stop on the gob pile was a discussion with Ron Grimlen. There are a <br />couple of factors working against the Operator on the gob pile right now and their <br />efforts to achieve complete NOV abatement by the end of August. 1) The mine is <br />currently mining in a poor quality seam, so approximately 3,000 tons of gob are now <br />being hauled to the gob pile everyday, 2) A very wet monsoon season is upon us, 3) <br />the storm event that occurred on July 28 caused a significant amount of damage to <br />ditches and culverts. The majority of the last week was spent repairing drainage <br />facilities damaged in the storm. Ditch F4 was being re- constructed while I was on <br />site. Two track hoes were working on sorting riprap out of the coverfill pile, and one <br />track hoe was building the ditch. That means three track hoes were not working on <br />the gob pile, which has slowed down progress on the pile. It is understood the <br />priority is NOV- 2013 -004 abatement and every effort is being made to re- handle, <br />place and compact end dumped gob that had accumulated over the winter months. <br />But there is still a lot to do before the August 30 deadline. As shown on page 6, on <br />the top of the pile - east side, there are a few peaks of gob material that still need to <br />be placed and compacted. It is anticipated that this material will be compacted and <br />placed prior to the NOV abatement deadline. There is a section of end dumped <br />material in the expansion area where gob was stacked over the winter, and is the <br />location where gob is currently being dumped. The active end dumping area is <br />being effectively managed, meaning large sections of end dumped materials are not <br />running down the face of the slopes, and the end dumped material is being actively <br />worked in an effort to dry the material out. However, there is still a lot of material <br />that must be processed in order for complete NOV abatement. That is what the <br />priority on the ground is, and the Operator is diligently working to re- handle, place <br />and compact material stacked over the winter months. <br />The modeling for the air permit for gob pile #3 is complete, and has been accepted <br />by CDPHE. Bowie was told during a meeting with CDPHE that once the modeling <br />was approved they could grant enforcement discretion. In order to provide some <br />relief to the gob pile #2 area, Bowie plans to ask for enforcement discretion for the <br />gob pile #3 area. Once enforcement discretion is granted, gob would be hauled to <br />gob pile #3 instead of gob pile #2, which would allow for more progress on gob pile <br />#2. It is unknown when the enforcement discretion will be granted. <br />Bowie acquired soil samples for the TR -77 alternate topsoil demonstration. They <br />will be sent to the lab, and we should have results within a couple of weeks. <br />