Laserfiche WebLink
Page3 OF <br />13. Is the reserved topsoil vegetated/stabilized in accordance with Rule 3.1.9(1)? YES NO N/A <br />If "NO" please explain: <br />14. If exploration has exposed groundwater, is the site in compliance %vith the approved mining plan and Office of the <br />State Engineer (Well Permit, S.W.S.P., and /or Permanent Augmentation Plan)? YES NO N/A <br />15. Are all Hazardous materials stored within approved spill contauunent structures? YES NO N/A <br />1-6. Does your NOT reclamation plan or Enviromuental Protection Plan require you to submit monitoring information <br />annually? YES NO N/A <br />If "Yes ", please attach the required monitoring results to this Annual Report as required by Rule 1.15(1)(c). <br />17. As required by Rule 5.6(1)(g) subnut with this report documentation to show that the Financial Wnn-anty is -till in <br />place and is adequate to fully reclaim the approved prosper <br />No -For financial warranty Information please refer <br />FINANCIAL WARRANTY DOCUMENTATION ATTAC to each of the previously submitted Annual reports <br />contained within this DBMS Prospecting NOI file. <br />1$. Please use the space below to describe as required by Rule 5.6(1)(c) any new prospecting activity that occurred during <br />the preceding year, includbig the locations and number of new surface drill holes, mud pits, excavations, rock dumps, <br />adits, shafts, trenches; pits, roads and structures. If applicable, you must also describe the measures taken to safeguard <br />shafts, adits and other mine openings ftarn unauthorized entry both during and after prospecting. Additional pages <br />should be attached if needed. <br />No new prospecting activities have occurred at any <br />of the drill pads. Wells remain locked, no open well <br />bores. <br />