Laserfiche WebLink
DEPARTMENT OF NATURAL RESOURCES <br />DIVISION OF WATER RESOURCES <br />John W. Hickenlooper <br />Governor <br />Mike King <br />Executive Director <br />Dick Wolfe, P.E. <br />Director /State Engineer <br />Prior to initiation of these uses of ground water, the applicant will need to obtain either a gravel pit or <br />other type of well permit, as applicable. However, prior to obtaining a permit, an approved water supply <br />plan or decreed plan for augmentation is required in overappropriated areas. Currently this location is not <br />considered overappropriated, however, if this area becomes overappropriated, augmentation will be <br />required. <br />❑ Prior to approving a well permit, the applicant must conduct a field inspection of the site and document <br />the locations of all wells within 600 feet of the permit area. The applicant must then obtain a waiver of <br />objection from all well owners with wells within 600 feet of the permit area or request a hearing before the <br />State Engineer. <br />❑ The proposed operation may have potential impact on existing water rights near the project location. <br />Please provide evidence that the proposed project will not alter or impact the historic operation of existing <br />water rights. <br />❑ The applicant has indicated plans to use other water for: ❑ uses at the permit site, ❑ storage in the <br />excavated area(s), ❑ other: . The applicant will need to provide evidence to this office that the <br />water is permitted or decreed for such uses. <br />® Other: Any exposed ground water must be backfilled immediately until a well permit issued pursuant to <br />CRS 37 -90- 137(2), allowing the exposure of ground water in a pit, is obtained from the State Engineer. <br />Office of the State Engineer <br />1313 Sherman Street, Suite 818 • Denver, CO 80203 • Phone: 303 - 866 -3581 • Fax: 303 - 866 -3589 <br />http://water.state.co.us <br />Response to Reclamation Permit Application Consideration <br />TO: <br />Stephanie J. Reigh, Environmental Protection Specialist <br />CC: <br />Division 5 Office, District 72 Water Commissioner <br />FROM: <br />Ivan Franco, Water Resources Engineer if- <br />DATE: <br />August 2, 2013 <br />RE: <br />,/ <br />BLM Burnt Shale Pit, File No. M -1985 -170 <br />Section 9, Twp 7South, Rng 102 West, 6th P.M., Garfield County <br />RECEIVED <br />Operator: Colorado Department of Transportation <br />Contact: Colorado Department of Transportation <br />b/ <br />AM n 9 2013 <br />606 S. 9" St. <br />Grand Junction, CO 81501 <br />i <br />DIVISION OF RECLAMATION <br />(970J 683 -6308 <br />MINING AND SAFETY <br />CONDITIONS FOR APPROVAL <br />® <br />The proposed operation does not anticipate exposing groundwater. <br />Therefore, exposure of ground water <br />must not occur during or after mining operations. <br />❑ <br />The proposed operation will consume ground water by: ❑ evaporation, ❑ dust control, ❑ reclamation, <br />❑ water removed in the mined product, ❑ processing, ❑ other: <br />Prior to initiation of these uses of ground water, the applicant will need to obtain either a gravel pit or <br />other type of well permit, as applicable. However, prior to obtaining a permit, an approved water supply <br />plan or decreed plan for augmentation is required in overappropriated areas. Currently this location is not <br />considered overappropriated, however, if this area becomes overappropriated, augmentation will be <br />required. <br />❑ Prior to approving a well permit, the applicant must conduct a field inspection of the site and document <br />the locations of all wells within 600 feet of the permit area. The applicant must then obtain a waiver of <br />objection from all well owners with wells within 600 feet of the permit area or request a hearing before the <br />State Engineer. <br />❑ The proposed operation may have potential impact on existing water rights near the project location. <br />Please provide evidence that the proposed project will not alter or impact the historic operation of existing <br />water rights. <br />❑ The applicant has indicated plans to use other water for: ❑ uses at the permit site, ❑ storage in the <br />excavated area(s), ❑ other: . The applicant will need to provide evidence to this office that the <br />water is permitted or decreed for such uses. <br />® Other: Any exposed ground water must be backfilled immediately until a well permit issued pursuant to <br />CRS 37 -90- 137(2), allowing the exposure of ground water in a pit, is obtained from the State Engineer. <br />Office of the State Engineer <br />1313 Sherman Street, Suite 818 • Denver, CO 80203 • Phone: 303 - 866 -3581 • Fax: 303 - 866 -3589 <br />http://water.state.co.us <br />