My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-07-01_PERMIT FILE - C1981018 (6)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981018
>
2013-07-01_PERMIT FILE - C1981018 (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:21:53 PM
Creation date
8/6/2013 8:27:51 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018
IBM Index Class Name
Permit File
Doc Date
7/1/2013
Doc Name
Air Quality Permits
Section_Exhibit Name
Illustration 43
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
e3 <br />Colorado Department of Public Health and Environment <br />Air Pollution Control Division <br />Blue Mountain Energy, Inc <br />Permit No. 12RB802 -2 <br />Initial Approval <br />increases the potential to emit above the applicable OP threshold shall require submittal of and <br />issuance of an operating permit, under Regulation No. 3, Part C. <br />7. <br />8. <br />9. <br />10 <br />11 <br />The applicant shall follow the most current operating and maintenance plan and record keeping <br />format approved by the Division in order to demonstrate compliance on an ongoing basis with the <br />requirements of this permit. (Reference: Regulation No. 3, Part B, Section III G 7.) <br />The particulate emission control measures listed on the attached page (as approved by the <br />Division) shall be applied to the particulate emission producing sources as required by Regulation <br />No. 1, Section I I I. D.1. b. <br />All coal conveyors and transfers shall be fully enclosed except for plant reject conveyors. <br />Spray bars shall be used on plant reject conveyor system and truck loadout conveyor system if <br />material moisture content is insufficient to control particulate emissions. <br />All crushers and screens shall be fully enclosed. <br />12. Public access shall be precluded to areas identified as "modeling receptor exclusion zones" in the <br />dispersion modeling submitted with the application No tresspassing signs shall be posted along the <br />exclusion zone boundaries at reasonable points of public access. Mine personnel shall frequently <br />monitor property to prevent tresspassing during normal operations. <br />13. Emissions of air pollutants shall not exceed the following limitations (as calculated in the Division's <br />preliminary analysis). Compliance with the annual limits shall be determined on a rolling (12) <br />month total. By the end of each month a new twelve month total is calculated based on the <br />previous twelve months' data. The permit holder shall calculate monthly emissions and keep a <br />compliance record on site for Division review (Reference: Regulation No. 3, Part B, Section <br />II.AA) <br />Particulate Matter: 10.9 tons per year. <br />PM 10 (Particulate Matter <10 µm). 5 2 tons per year. <br />Particulate Matter - Fugitive: 11.1 tons per year. <br />PM10 (Particulate Matter <10 µm) - Fugitive: 5.6 tons per year. <br />Compliance with the fugitive particulate matter emission limits shall be demonstrated by not <br />exceeding the throughput limits, and by the application of the emission control measures. <br />14. This source shall be limited to throughputs as listed below and all other activities, operational rates <br />and numbers of equipment as stated in the application Compliance with the yearly production limits <br />shall be determined on a rolling twelve (12) month total. Monthly records of the actual production rate <br />shall be maintained by the applicant and made available to the Division for inspection upon request <br />(Reference Regulation No. 3, Part B, Section II A 4 ) <br />Primary coal (including oversize recycle) crushing shall not exceed 800,000 tons per year <br />Secondary coal crushing shall not exceed 1,040,000 tons per year <br />Primary coal screening shall not exceed 3,200,000 tons per year <br />Secondary coal screening shall not exceed 2,600,000 tons per year. <br />Area for coal stockpiles shall not exceed 1.4 acres <br />Coal mined shall not exceed 3,200,000 tons per year <br />103/0014/003 ver. 2/00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.