Laserfiche WebLink
BLUE MOUNTAIN ENERGY, INC. <br />Permit No. 12RB802 -1 F <br />Final Approval <br />Page 3 <br />PARTICULATE EMISSIONS CONTROL PLAN FOR MINING ACTIVITIES <br />THE FOLLOWING PARTICULATE EMISSIONS CONTROL MEASURES SHALL BE USED FOR COMPLIANCE PURPOSES ON THE <br />ACTIVITIES COVERED BY THIS PERMIT, AS REQUIRED BY THE AIR QUALITY CONTROL COMMISSION REGULATION NO. 1, Section <br />III.D.1.b. THIS SOURCE IS SUBJECT TO THE FOLLOWING EMISSION GUIDELINES: <br />Control Measures <br />The stockpile shall be watered as necessary such that a surface moisture content of at least 6% is maintained. <br />2. The stockpile shall be constructed such that the windward side of the pile is at a slope of no more than 35 %. <br />103/0014/002 <br />