Laserfiche WebLink
Blue Mountain Energy, Inc. <br />Permit No. 12RB802 -5 <br />Final Approval Colorado Department of Public Health and Environment <br />page 2 Air Pollution Control Division <br />4. This source shall be limited to a maximum production rate as listed below and all other activities, <br />operational rates and numbers of equipment as stated in the application. Monthly records of the <br />actual production rate shall be maintained by the applicant and made available to the Division for <br />inspection upon request. (Reference: Regulation 3, Part B, III.A.4) <br />Production /Processing of coal shall not exceed 25,000 tons per day or 2,600,000 tons per year. <br />Compliance with the yearly production limits shall be determined on a rolling twelve (12) month <br />total. <br />5. All conveyors shall have conveyor covers and transfer points shall be fully enclosed. <br />6. A Revised Air Pollutant Emission Notice (APEN) shall be filed: (Reference: Reg. 3, Part A,II.C) <br />a. Annually whenever a significant increase in emissions occurs as follows: <br />For any criteria pollutant: <br />For sources emitting less than 100 tons per year, a change in actual emissions of five <br />tons per year or more, above the level reported on the last APEN submitted; or <br />For sources emitting 100 tons per year or more, a change in actual emissions of five <br />percent or 50 tons per year or more, whichever is less, above the level reported on the <br />last APEN submitted; or <br />For any non - criteria reportable pollutant: <br />If the emissions increase by 50% or five (5) tons per year, whichever is less, above the <br />level reported on the last APEN submitted to the Division. <br />b. Whenever there is a change in the owner or operator of any facility, process, or activity; or <br />C. Whenever new control equipment is installed, or whenever a different type of control <br />equipment replaces an existing type of control equipment; or <br />d. Whenever a permit limitation must be modified; or <br />e. No later than 30 days before the existing APEN expires. <br />7. All previous versions of this permit are canceled upon issuance of this permit. <br />R K Hancock III Koharhd C. Hea, .E. <br />Permit Reviewer Unit Leader <br />Issued: Initial Approval issued June 30, 1981 <br />Initial Approval modfcation #1 issued November 29, 1992 <br />Final Approval and modification #2 (Name Change) issued April 15, 1998 <br />Final Approval modr ication #3 issued May 23, 2001 <br />Modification #1: Increase in production from 1,350,000 tons /year to 1,600,000 tonstyear <br />Modification #2 (Name Change), Name change to Blue Mountain Energy, Inc. <br />Modification #3: Increasing throughputs from 6700 tons per day and 1,600,000 tons per year. <br />Modification #4: Increasing throughput limits from 20,000 tons per day and 2,400,000 tons per year <br />Notes to Permit Holder: <br />103/0014/005 ver. 2/00 <br />