Laserfiche WebLink
MASTER TABLE OF CONTENTS <br />IV.P Equipment and Material Storage Facilities ............................... ..........................IV -54 <br />• IV.Q Miscellaneous ........................................................................... ..........................IV -55 <br />Section IV Appendix _ <br />IVA Refuse Area Soil Depths <br />V. MINE SURFACE FACILITIES RECLAMATION PLAN ........................ ............................V -1 <br />V.A Water Quantity and Quality Control Plan ................................... ............................V -1 <br />Technical Revision #68 (01/2011) <br />V.A.1 Water Quantity Control Plan .......................................... ............................V -1 <br />V.A.2 Water Quality Control Plan ............................................. ............................V <br />-4 <br />V.B <br />Design, Construction and Operation of Ponds and Waste Banks .........................V <br />-5 <br />V.13.1 General V -5 .................................................................. ............................V -5 <br />V.13.2 Dewatering Mechanics ................................................... ............................V -5 <br />V.6.3 Disposal Site Characteristics .......................................... ............................V -7 <br />V.13.4 Sedimentation Ponds Design ......................................... ............................V -8 <br />V.B.5 Waste Banks Design ..................................................... ...........................V -12 <br />V.B.6 Post Reclamation Sediment Control ............................. ...........................V -14 <br />V.0 <br />Diversions .................................................................................. ...........................V -15 <br />V.D <br />Storage and Disposal of Acid - Forming, Toxic - Forming and Combustible <br />• <br />Materials .................................................................................... ...........................V -16 <br />V.E <br />Disposal of Mine Development Waste ...................................... ...........................V -17 <br />V.F <br />Sealing of Mine Openings and Drill Holes ............................................................ V -17 <br />V.G <br />Backfilling and Contouring ......................................................... ...........................V -21 <br />V.G.1 Revegetation Study with Various Topsoil Depths ......... ...........................V -22 <br />V.H <br />Removal, Storage and Redistribution of Topsoil ....................... ...........................V -23 <br />V.I <br />Revegetation .............................................................................. ...........................V -29 <br />V.1.1 Introduction .................................................................... ...........................V <br />-29 <br />V.1.2 General Specifications and Environmental Limitations ...........................V <br />-30 <br />V.1.3 Phases and Timing ........................................................ ...........................V <br />-32 <br />V.1.4 Site Preparation Techniques and Materials .................. ...........................V <br />-35 <br />V.1.4.a Seed Selection ............................................... ...........................V <br />-35 <br />V.1.4.b Fertilizer .......................................................... ...........................V <br />-37 <br />V.1.4.c Mulch .............................................................. ...........................V <br />-37 <br />V.1.4.d Seedbed Preparation ..................................... ...........................V <br />-38 <br />V.1.4.e Seeding Operations ....................................... ...........................V <br />-39 <br />V.1.4.f Planting Time ................................................. ...........................V <br />-39 <br />V.1.4.g Evaluation and Follow- up ............................... ...........................V <br />-45 <br />V.1.4.h Riparian Revegetation .................................... ...........................V <br />-45 <br />• <br />V.1.4.i Remedial Treatment of Refuse Area 1 .......... ...........................V <br />-48 <br />Technical Revision #68 (01/2011) <br />