My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-07-29_REPORT - M1986079
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1986079
>
2013-07-29_REPORT - M1986079
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:23:00 PM
Creation date
8/5/2013 3:49:44 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1986079
IBM Index Class Name
REPORT
Doc Date
7/29/2013
Doc Name
ANNUAL FEE/REPORT
From
OPERATOR
To
DRMS
Email Name
BMK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mann Resources, LLC <br />Permit # M- 1986 -079 <br />25 -July -2013 <br />Notes: <br />M &G PIT <br />2013 Annual Report <br />3 & 4. Mann Resources assumed this permit from Lafarge, Inc. in 2010 and <br />reclamation was ongoing at that time. Mining ended prior to Mann Resources <br />taking the permit over. Reclamation called for backfilling the lake area and <br />reclaiming the site the limited amount of material available had delayed the <br />progress of backfilling the site until this year. We now have a approved Fill Permit <br />from Adams County that allows us to import uncontaminated fill material (clean <br />dirt) and fill is being delivered daily. <br />9. We continued to backf ill the lake area with material as approved in the permit. <br />Backf ill material was placed in the northern part of the mine and along the west <br />side of the storm drain channel. Our plan is to eventually backf ill the lake area <br />and return the ground level to near what originally existed prior to mining. We <br />expect to have filling completed within 2 to 4 years as there is now a steady <br />source of fill material meeting our permit requirements. <br />11. Backfilling will continue in the cross hatched area ( / //) and along the edges of <br />the lakes until final grade is reached. <br />16. The mine has an approved SWSP from the State Engineer and is replacing <br />water as backfilling progresses. <br />21. Please refer to the 2013 Annual Report Map for location of the areas of <br />disturbance in the mine. <br />
The URL can be used to link to this page
Your browser does not support the video tag.