Laserfiche WebLink
SL -4 Adequacy Review 2 <br />Page 3 <br />PM4 -D Drainage: <br />S) It was noted during the June 4, 2013 inspection that a gully has formed midway down the PM4 -D <br />drainage. It appears water has undercut the TRM used to stabilize this drainage. This gully will <br />need to be repaired prior to the approval of the Phase I bond release for this drainage. Please <br />submit documentation this gully has been repaired. <br />Response and Status: SCC's response letter indicated this drainage can be removed from the <br />SL4 bond release area. No further action is necessary, the Division will remove it's <br />consideration of this parcel for Phase I bond release at this time. <br />Response: No response necessary. <br />If there are further questions or concerns please contact me. <br />Sincerely, <br />Roy A. Karo <br />Seneca Coal Company <br />Reclamation Manager <br />attachment(s) <br />