Laserfiche WebLink
M- 2008 -078 — GP Aggregates, LLC — West Farm Pit — Technical Revision Request No. 2 <br />July 26, 2013 <br />-3- <br />It is anticipated that the interior slurry wall will be removed prior to final reclamation of the site so <br />that a single open pit will remain at the conclusion of mining in the north mining area. <br />Attached is a revised Exhibit C - Pre - Mining /Mining Plan map that shows the revisions discussed <br />above. <br />Exhibit F=— Reclamation Plan Maa <br />Revision to reclamation slope /liner to utilize an impermeable slurry wall to line the finished reservoir <br />in lieu of a compacted clay liner. <br />The reclamation slope has been revised to use an impermeable slurry wall in lieu of a compacted <br />clay liner to achieve a cutoff of groundwater between the surrounding alluvial aquifer and the <br />reclaimed reservoir. The 3:1 reclamation slope will be identical to the mining slope with a minimum <br />setback of 25 feet from the edge of the slurry wall. <br />Attached is a revised Exhibit F - Reclamation Plan map that shows the revised reclamation slope. <br />Reclamation Bond: Revision to the financial warranty required for the reclamation of each <br />phase of mining. <br />1. The financial warranty calculations have been revised as follows: <br />a. The area disturbed by the construction of the interior slurry wall has been added to the <br />financial warranty required for Phase 1A. <br />b. The financial warranty required for each phase has been updated to reflect the revised <br />locations of the phases and slurry wall costs in lieu of compacted clay liner costs. <br />A revised Exhibit L — Reclamation Costs and supporting calculations are attached which summarize the <br />revision to the financial warranty requirements. <br />GP appreciates your consideration of this revision request and looks forward to your response. <br />Please feel free to contact me with any questions or comments. <br />Sincerely, <br />Todd Yee r <br />UT Consulting,, Inc. <br />Attachments: <br />Revised Exhibit C - Pre - Mining /Mining Plan Map <br />Revised Exhibit F - Reclamation Plan Map <br />Revised Exhibit L - Reclamation Costs and Reclamation Costs Summary Table <br />Revised Financial Warranty Requirement Calculations <br />"Subsurface and Laboratory Data - West Farm Slurry Wall" by J.A. Cesare and Associates dated August 10, 2011 <br />V1 <br />305 Denver Avenue, Suite D • Fort Lupton, CO 80621 • Ph: 303 - 857 -6222 • Fax: 303 - 857 -6224 <br />