Laserfiche WebLink
Table No. 5 <br />Lafarge West, Inc. <br />Middle Poudre Combined SWSP 2012 <br />Projected 2013 Water Balance <br />2012 FHD = 269.84 ac-ft <br />Applegate <br />Group. <br />Additional Replacements <br />7/11/2013 <br />10 -106 <br />Month <br />Total Combined <br />Lagged <br />Depletions <br />ac ft <br />Farm Headgate <br />Delivery for <br />Recharge of 5 <br />shares <br />ac ft <br />Evap at <br />Recharge Pit <br />for Box Elder <br />shares <br />ac ft <br />La <br />Lagged Recharge <br />Credit of Box <br />Elder Shares <br />ac ft <br />Return Flow <br />Factor <br />ac ft <br />Return Flow <br />Obligation <br />ac ft <br />Inihal Net Impact <br />to the Poudre <br />River <br />ac k <br />Aurora Lease <br />ac ft <br />Aurora <br />Transit Loss <br />ac ft <br />LCRC Lease <br />ac k <br />Martin <br />Marietta <br />Lease <br />ac k <br />Martin <br />Marietta <br />Transit Loss <br />ac k <br />Final Net Impact <br />to the Poudre <br />River <br />ac ftA <br />B <br />C <br />E <br />F <br />G <br />H <br />I <br />J <br />K <br />L <br />M <br />N <br />Jan -13 <br />24.06 <br />0.00 <br />0.00 <br />21.21 <br />1.7% <br />4.59 <br />-7.43 <br />9.2 <br />1.52 <br />0.25 <br />Feb -13 <br />21.51 <br />0.00 <br />0.00 <br />18.29 <br />1.5% <br />4.05 <br />-7.27 <br />8.9 <br />1.47 <br />0.16 <br />Mar -13 <br />21.81 <br />0.00 <br />0.00 <br />16.23 <br />1.3% <br />3.51 <br />-9.09 <br />11.1 <br />1.83 <br />0.18 <br />Apr-13 <br />21.59 <br />39.38 <br />0.21 <br />39.17 <br />18.52 <br />1.3% <br />3.51 <br />-6.58 <br />11.0 <br />4.42 <br />May-13 <br />14.83 <br />63.79 <br />0.25 <br />63.54 <br />28.60 <br />25.1% <br />16.01 <br />-2.24 <br />13.0 <br />10.76 <br />Jun -13 <br />19.54 <br />90.27 <br />0.36 <br />89.91 <br />40.47 <br />25.2% <br />22.75 <br />-1.82 <br />3.0 <br />1.18 <br />Jul -13 <br />24.83 <br />147.04 <br />0.41 <br />146.63 <br />57.03 <br />22.2% <br />32.64 <br />-0.44 <br />1.5 <br />1 <br />1.06 <br />Aug-13 <br />38.29 <br />103.40 <br />0.37 <br />103.03 <br />71.92 <br />34.5% <br />35.67 <br />-2.05 <br />2.5 <br />0.45 <br />Sep-13 <br />34.18 <br />40.18 <br />0.27 <br />39.91 <br />66.61 <br />67.1% <br />26.96 <br />5.48 <br />5.48 <br />Oct -13 <br />29.89 <br />9.19 <br />0.17 <br />9.02 <br />50.86 <br />4.0% <br />19.73 <br />1.24 <br />1.24 <br />Nov -13 <br />25.61 <br />0.00 <br />0.00 <br />37.24 <br />2.7% <br />13.32 <br />-1.68 <br />4.0 <br />1.32 <br />0.99 <br />Dec -13 <br />20.86 <br />0.00 <br />1 0.00 <br />28.79 <br />2.1% <br />10.36 <br />-2.42 <br />5.0 <br />1.65 <br />0.93 <br />Total <br />296.99 <br />493.25 <br />2.04 1 <br />491.21 <br />455.77 <br />193.09. <br />-34.31 <br />29.2 <br />4.83 <br />31.0 <br />9.0 <br />1 2.97 <br />27.09 <br />(B) KYQer Pit lapped depletions: includes post - pumping laooed deoletions from oast dewatering <br />(A) Total lagged depletions from Table No. 1 Column (G) <br />(B) Projected diversions into recharge in 2012 for 5 Box Elder Ditch Company shares <br />(C) Estimated evaporation losses from the recharge site assuming 1.0 acre pond at gross evaporation rate <br />(D) _ (B) - (C) <br />Distance from Metro WWTP to Poudre River Confluence = 66.1 miles <br />Transit Loss Rate = 0.25% per mile prior to May <br />0.50% per mile from May onwards <br />(E) Lagged recharge from recharge model in Appendix E <br />(R) Return flow factors from Table No. 4 Column (F) <br />(G) May through September: Columns (B) * (F). October through April: Column (F) * Total farm headgate delivery from previous irrigation season <br />(H) Columns (E) - (A) - (G) (positive values indicate a net accretion) <br />(I) Lease with the City of Aurora <br />(J) Transit loss assessed based on river miles from Metro WWTP to Poudre River confluence and general transit loss rate <br />(K) Lease with the Lake Canal Reservoir Company; additional water released by LCRC to account for a transit loss of 4.1% <br />(L) Lease with Martin Marietta Materials, Inc. for excess replacement credit under their South Platte Combined SWSP <br />(M) Transit loss assessed based on river miles from Metro WWTP to Poudre River confluence and general transit loss rate <br />(N) _ (H) + [(I) - (J)] + (K) + [(L) - (M)] <br />