Laserfiche WebLink
-4- <br />12. Primary future (Post- mining) land use (check one): <br />Cropland(CR) Pastureland(PL) General Agriculture(GA) <br />Rangeland(RL) Forestry(FR) Wildlife Habitat(WL) <br />Residential(RS) ]E] Recreation(RC) IndustriaUCommercial(IC) <br />Developed Water Resources(WR) Solid Waste Disposal(WD) <br />13. Primary present land use (check one): <br />0 Cropland(CR) Pastureland(PL) General Agriculture(GA) <br />✓� Rangeland(RL) Forestry(FR) �( Wildlife Habitat(WL) <br />Residential(RS) Recreation(RC) !_J Industrial /Commercial(IC) <br />Developed Water Resources(WR) <br />14. Method of Mining: Briefly explain mining method (e.g. truck/shovel): <br />Loaders extract raw material and feed processing plant. <br />15. On Site Processing: • Crushing /Screening <br />13.1 Briefly explain mining method (e.g. truck/shovel): <br />Material is crushed and screen on site. <br />List any designated chemicals or acid - producing materials to be used or stored within permit area: <br />NA <br />16. Description of Amendment or Conversion: <br />If you are amending or converting an existing operation, provide a brief narrative describing the proposed change(s). <br />Final reclamation is changing from unlined Evans Lake to lined water storage reservoir with <br />wetlands and open space for recreation. Amended exhibits include C, D, E and F. The <br />permit. Fremont Paving understands Exhibit L may change with this amendment application. <br />