J &T Consulting, Inc. GP Aggregates LLC <br />' West Farm Pi <br />7/26/2013 <br />FRamation Bond Quantities and Costs tp <br />AT Censultln[. Inc. on 15 GP <br />Aggregates Rec Bond Calcs TR2 <br />Phase 4 (9.60 acres) <br />lKeciamauon operation <br />uuanttry <br />unit <br />unit <br />cost <br />cost <br />Active Mining Area <br />Credit for Topsoil Area Above Water Required for Phases 1 -3 <br />(4.9) <br />ac <br />$ <br />2,000 <br />$ (9,815) <br />Credit for Revegetated Area Above Water Required for Phases 1 -3 <br />(4.9) <br />ac <br />$ <br />1,000 <br />$ (4,907) <br />Topsoil Area Above Water Required for Phases 1 -4 <br />5.0 <br />ac <br />$ <br />2,000 <br />$ 10,017 <br />Revegetate Area Above Water Required for Phases 1 -4 <br />5.0 <br />ac <br />$ <br />1,000 <br />$ 5,008 <br />Mobilization <br />1.00 <br />Is <br />$ <br />2,500 <br />$ 2,500 <br />Dewatering of Full Pit for Phase 5 <br />160.2 <br />Mil. Gal. <br />Total Direct Cost <br />$ 17,525 <br />Overhead and Profit Cost (12.60 %) $ 2,208 <br />Contract Cost $ 19,733 <br />Project Management (9.25%) $ 1,621 <br />Additional Financial Warranty Required For Phase 4 $ 21,354 <br />Phase 5 (9.09 acres) <br />iiteciamation operation <br />uuantity <br />unit <br />unit <br />cost <br />cost <br />Active Mining Area <br />Credit for Topsoil Area Above Water Required for Phases 1 -4 <br />(5.0) <br />ac <br />$ <br />2,000 <br />$ (10,017) <br />Credit for Revegetated Area Above Water Required for Phases 1 -4 <br />(5.0) <br />ac <br />$ <br />1,000 <br />$ (5,008) <br />Slurry Wall Required to Close Phase 5 (70' avg Depth) <br />2,239 <br />If <br />$ <br />230 <br />$ 514,970 <br />Topsoil Area Above Water Required for Phases 1 -5 <br />6.5 <br />ac <br />$ <br />2,000 <br />$ 12,916 <br />Revegetate Area Above Water Required for Phases 1 -5 <br />6.5 <br />ac <br />$ <br />1,000 <br />$ 6,458 <br />Dewatering of Full Pit for Phase 5 <br />160.2 <br />Mil. Gal. <br />$ <br />350 <br />$ 56,087 <br />Mobilization <br />1.00 <br />Is <br />$ <br />2,500 <br />$ 2,500 <br />Mobilization <br />1.00 <br />Total Direct Cost <br />$ 577,907 <br />Overhead and Profit Cost (12.60 %) $ 72,816 <br />Contract Cost $ 650,723 <br />Project Management (9.25%) $ 53,456 <br />Additional Financial Warranty Required For Phase 5 $ 704,179 <br />Phase 6 (9.51 acres) <br />'rceciamation uperation <br />Uuantlty <br />unit <br />unit <br />cost <br />Gost <br />Active Mining Area <br />Credit for Slurry Wall Required to Close Phase 5 (70' avg Depth) <br />(2,239) <br />If <br />$ <br />230 <br />$ (514,970) <br />Credit for Topsoil Area Above Water Required for Phases 1 -5 <br />(6.5) <br />ac <br />$ <br />2,000 <br />$ (12,916) <br />Credit for Revegetated Area Above Water Required for Phases 1 -5 <br />(6.5) <br />ac <br />$ <br />1,000 <br />$ (6,458) <br />Slurry Wall Required to Close Phases 5 -6 (70' avg Depth) <br />2,724 <br />If <br />$ <br />230 <br />$ 626,520 <br />Topsoil Area Above Water Required for Phases 1 -6 <br />6.5 <br />ac <br />$ <br />2,000 <br />$ 12,902 <br />Revegetate Area Above Water Required for Phases 1 -6 <br />6.5 <br />ac <br />$ <br />1,000 <br />$ 6,451 <br />Dewatering of Full Pit for Phase 6 <br />158.5 <br />Mil. Gal. <br />$ <br />350 <br />$ 55,486 <br />Mobilization <br />1.00 <br />Is <br />$ <br />2,500 <br />$ 2,500 <br />Total Direct Cost <br />$ 169,514 <br />Overhead and Profit Cost (12.60 %) $ 21,359 <br />Contract Cost $ 190,873 <br />Project Management (9.25 %) $ 15,680 <br />Additional Financial Warranty Required For Phase 6 $ 206,553 <br />3of7 <br />