My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-07-25_REVISION - M2008078
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2008078
>
2013-07-25_REVISION - M2008078
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:22:54 PM
Creation date
7/30/2013 3:27:40 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2008078
IBM Index Class Name
Revision
Doc Date
7/25/2013
Doc Name
GP Aggregates LLC West Farm Pit Technical Revison no 2 Request
From
J&T Consulting Inc
To
DRMS
Type & Sequence
TR2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
VI <br />July 26, 2013 <br />J &T Consulting, Inc. <br />Mr. Tyler O'Donnell <br />Environmental Protection Specialist <br />State of Colorado <br />Division of Reclamation, Mining, & Safety <br />1313 Sherman Street — Room 215 <br />Denver, CO 80203 <br />RECEIVED <br />Ji i! � 2013 <br />DIVISION OF RECLAMATION ✓ <br />MINING AND SAFETY <br />RE: GP Ag re a es LLC. — West Farm Pit — Technical Revision No. 2 R equest <br />F, e o. M- 2008 -078P/ <br />Dear Mr. O'Donnell, <br />GP Aggregates, LLC. (GP) requests a revision to their existing permit to address the following 2 items: <br />1. Exhibit C — Pre - Mining /Mining Plan <br />a. Revision of the mine phasing. <br />b. Revision (reduction) of the total mining area. <br />c. Revision of mining slope from vertical to 3:1. <br />d. Addition of an interior impermeable slurry wall around revised phases 1 -4. <br />2. Exhibit F — Reclamation Plan <br />a. Revision to reclamation slope /liner to utilize an impermeable slurry wall to line the <br />finished reservoir in lieu of a compacted clay liner. <br />3. Exhibit L — Reclamation Costs <br />a. Revision of the financial warranty required for the reclamation of each phase of mining. <br />Detailed descriptions of these revisions are in the following sections. <br />Exhibit C — Pre- Minin_g/Minin_a Plan <br />Revision of mine phasing <br />Phase 1A remains unchanged. Phasing for the mine has been revised to start in the northeast <br />corner of the site in the north mining area. Phases 1 through 4 are clustered in that corner of the <br />mine. Mining in the north mining area will then move to the northeast corner of the site in Phase 5 <br />and proceed to the south, then west, through Phase 9. Phases 10 through 13 will then be <br />completed from east to west in the north mining area. No revisions to the phases in the south <br />mining area are requested. Minor revisions to the boundaries of Phases 1, 2, 3, 5, 9, & 12 have <br />been shown to accommodate the construction of an impermeable slurry wall adjacent to the <br />perimeter of these phases and provide a minimum 25 foot setback from the top of mining slope to <br />the edge of the slurry wall. <br />4 305 Denver Avenue, Suite D • Fort Lupton, CO 80621 - Ph: 303 -857 -6222 - Fax: 303 - 857 -6224 <br />
The URL can be used to link to this page
Your browser does not support the video tag.