My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-07-29_REPORT - P2009009
DRMS
>
Day Forward
>
Report
>
Prospect
>
P2009009
>
2013-07-29_REPORT - P2009009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:23:00 PM
Creation date
7/29/2013 3:16:37 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2009009
IBM Index Class Name
REPORT
Doc Date
7/29/2013
Doc Name
ANNUAL FEE/REPORT
From
OPERATOR
To
DRMS
Email Name
TAK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 3 of 4 <br />13. Is the reserved topsoil vegetated/stabilized in accordance with Rule 3.1.9(1)? YES NO N/A <br />If "NO" please explain: <br />14. If exploration has exposed groundwater, is the site in compliance with the approved mining plan and Office of the <br />State Engineer (Well Permit, S.W.S.P., and/or Permanent Augmentation Plan)? NO N/A <br />i <br />15. Are all hazardous materials stored within approved spill containment structures? j NO N/A <br />16. Does your NOI reclamation plan or Environmental Protection Plan require you to submit monitoring information— <br />annually? , YES NO N/A <br />If "Yes ", please attach the required monitoring results to this Annual Report as required by Rule 1.15(1)(c). <br />17. As required by Rule 5.6(1)(g) submit with this report documentation to show that the Financial Warranty is still in <br />place and is adequate to fully reclaim the approved prospecting site disturbance(s). <br />FINANCIAL WARRANTY DOCUMENTATION ATTACHED: / 5 A,1r4-CWC-D <br />18. Please use the space below to describe as required by Rule 5.6(1)(c) any new prospecting activity that occurred during <br />the preceding year, including the locations and number of new surface drill holes, mud pits, excavations, rock dumps, <br />adits, shafts, trenches, pits, roads and structures. If applicable, you must also describe the measures taken to safeguard <br />shafts, adits and other mine openings from unauthorized entry both during and after prospecting. Additional pages <br />should be attached if needed. <br />f o-T I <br />D'5c +1 t2 +3+y <br />P(115 <br />,cam � <br />40 4q lci <br />P� �6 j <br />I <br />iI/- <br />L h f he pre c i jy tar- ex� /o.-v air Ivk p leice— r n <br />fiv- &-6V-e g P" �, <br />,4-<So Ars 2�3 wer'e- ,ex��ore u �ar� esc; s ��h - wo �rqc-k rocs a1 , <br />� J <br />vw,re_ Ill. 4e Oran e sot '►Girl a n� 3$i� �S <br />U <br />
The URL can be used to link to this page
Your browser does not support the video tag.