My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-07-23_REVISION - M2012032 (10)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2012032
>
2013-07-23_REVISION - M2012032 (10)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 5:51:42 PM
Creation date
7/29/2013 3:15:17 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2012032
IBM Index Class Name
REVISION
Doc Date
7/23/2013
Doc Name
TR-01 SUBMITTAL
From
GREG LEWICKI & ASSOCIATES
To
DRMS
Type & Sequence
TR1
Email Name
RCO
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geotextile <br />Product Data Sheet <br />PROPERTY <br />8oz <br />Mechanical <br />Mass /Unit Area (Typical) <br />ASTM D -5261 <br />8.0 oz /yd2 <br />Tensile Strength (Grab) <br />ASTM D-4632 <br />2051bs <br />Elongation <br />ASTM D-4632 <br />50% <br />Puncture <br />ASTM D-4833 <br />110 Ibs <br />CBR Puncture <br />ASTM D-6241 <br />525 lbs <br />Mullen Burst <br />ASTM D -3786 <br />350 psi <br />Trapezoidal Tear <br />ASTM D -4533 <br />80 Ibs <br />Endurance <br />UV Resistance% Retained at 500 <br />hrs <br />ASTM D-4355 <br />70% <br />nrul aunt <br />Apparent Opening Size <br />Permittivity <br />Water Flow Rate <br />Roll Sizes <br />C) Mine Water Pond Design <br />ASTM D -4751 <br />ASTM D-4491 <br />ASTM D-4491 <br />80 US Std. Sieve <br />1.50 sec i <br />110 gpm/ftz <br />12.5ftx360ft <br />15ftx300ft <br />The two 8" diameter gathering pipes will each have a valve at their end in the mine water pond, to allow <br />for maintenance of the pond. The pipe invert elevation will be a minimum of 1.0 feet above the pond <br />bottom. The pond will be excavated to the dimensions as shown on Map G -10, and will hold a volume of <br />approximately 14,500 cubic feet. A 4" diameter Schedule 40 PVC pipe will be placed in the pond bottom <br />and will discharge to Sneffels Creek only if maintenance is needed to the pond and it would need to be <br />fully drained. A valve on the inlet will be closed during normal operation. Map G -11 also shows the cross <br />section of the pond and the spillway detail. <br />The pond will be lined with one layer of 36" thick felt at the bottom followed by a 45 mil Polypropylene <br />liner. This is used in place of an EPDM liner since it is much stronger in tension on the slope. The pond <br />slopes are excavated to a maximum of 1.5H:1V slope on the inside and will be excavated from existing <br />waste rock on site. The Polypropylene liner will be anchored in a trench at the top of the pond. This <br />trench will be 2 feet deep, and the fabric will then extend one foot horizontally in the trench. Waste rock <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.