Laserfiche WebLink
PSCM submitted bond release application SL -01 for the Peabody Sage Creek Mine (C -2009- <br />087) on April 8, 2011. PSCM originally requested Phase II bond Released for 462.4 acres of <br />interim program and permanent program lands. This request was revised to 445.8 acres of <br />interim program and permanent program lands via a letter from PSCM received by the <br />Division on June 29, 2012. SL -01 seeks Phase II release of 445.8 acres of interim program <br />and permanent program lands that received Phase I bond release under SL -01 and SL -04 for <br />the Seneca 11 Mine (C -80 -005), which would change the remaining Phase I and II liabilities <br />to those shown in Table 3, third column. <br />Table 3 - Change in Acreage of the Peabody Sage Creek Mine <br />Peabody Sage Creek Mine C- 2009 -087 Disturbance Area Acreage <br />Interim and Permanent Program Areas <br />C- 2009 -087 <br />C- 2009 -087 <br />C- 2009 -087 <br />Issuance <br />Pre SL -01 <br />Post SL -01 <br />Total Acreage <br />2076.70 <br />1912.80 <br />1912.80 <br />Pre -Law Phase I <br />1.39 <br />1.39 <br />1.39 <br />Released <br />Pre -Law No Release <br />67.40 <br />67.40 <br />67.40 <br />Interim/Permanent <br />497.90 <br />497.90 <br />52.10 <br />Program Phase I <br />Released <br />Interim/Permanent <br />1161.60 <br />1161.60 <br />1607.40 <br />Program Phase II <br />Released <br />Interim/Permanent <br />38.10 <br />38.10 <br />38.10 <br />Program No Release <br />Permanent Program <br />52.60 <br />52.60 <br />52.60 <br />New Proposed <br />Disturbance <br />(Previously <br />undisturbed) <br />Permanent Program <br />257.71 <br />79.56 <br />79.56 <br />New Proposed <br />Disturbance <br />(Previously Phase III <br />Released) <br />New Proposed <br />0 <br />14.25 <br />14.25 <br />Disturbance <br />(Approved Revisions) <br />Peabody Sage Creek Mine Page 6 July 22, 2013 <br />Phase 11 Bond Release <br />