My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-06-18_PERMIT FILE - C2010089A (3)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C2010089A
>
2013-06-18_PERMIT FILE - C2010089A (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:21:32 PM
Creation date
7/26/2013 11:08:53 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2010089A
IBM Index Class Name
PERMIT FILE
Doc Date
6/18/2013
Doc Name
Mine Facilities
Section_Exhibit Name
Section 2.05.3(3)
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Domestic Water. A water well has been installed at the New Horizon North mine, and can be seen on <br />Map 2.05.3(3) -1 as well as Map 2.04.7 -1. This well will be plugged during final reclamation efforts. <br />Completion and reclamation diagrams can be found in Appendix 2.05.3(3) -2, along with the well test <br />report. <br />Solid Wastes. Solid waste will be picked up by the local waste disposal contractor for disposal in the <br />Montrose County Sanitary Landfill. The landfill is privately owned and operates under the regulations <br />mandated by the State of Colorado and Montrose County. Solid wastes not suitable for disposal at the <br />landfill will be transported to and disposed of in suitable, licensed facilities under the applicable Federal <br />and State regulations. When practicable, solid wastes will be separated for recycling. <br />Fuel Storage. Three above - ground fuel tanks will be utilized. Two tanks of approximately 12,000 <br />gallons capacity will be used for diesel storage and a tank of approximately 1,000 gallons capacity will be <br />used for gasoline storage. One of the diesel tanks and the gasoline tank will be located at the fuel and <br />lubricant storage and dispensing facility proximal to the truck shop. The second diesel tank will be <br />located near the pit to facilitate fueling for trucks and loader. This tank will be mounted on skids so that it <br />may be advanced as needed to remain near the active mine area. Both sets of tank s will be enclosed by <br />berms and will have spill prevention and safety protection devices as mandated by the appropriate <br />regulatory authorities.. Additionally, within the shop NHN will utilize a waste oil heat system comprised <br />of 1 -250 gallon day tank, and 2 -1000 gallon storage tanks. Spill prevention and containment measures <br />will be implemented under the NHN Mine Spill Prevention Control and Counter - measure (SPCC) Plan. <br />Coal Handling Structures. WFC has no proposed coal handling structures. The coal from the mine pit is <br />hauled in highway trucks to the power plant for processing and use. <br />Support Facilities and Utility Installations. All support facilities used in connection with the operation of <br />the mine, including but not limited to, mine buildings, equipment storage facilities, sheds, shops and <br />other buildings will be designed, constructed or reconstructed and located to minimize or control erosion <br />and siltation, water pollution and damage to public or private property. <br />Section 2.05.3(3) Page 3 June 2013 (MR 05) <br />z <br />.j <br />
The URL can be used to link to this page
Your browser does not support the video tag.