My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-07-25_HYDROLOGY - M1979059
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1979059
>
2013-07-25_HYDROLOGY - M1979059
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:22:52 PM
Creation date
7/26/2013 9:46:55 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1979059
IBM Index Class Name
HYDROLOGY
Doc Date
7/25/2013
Doc Name
Order to Submit Accounting- SWSP
From
DWR-Water Division 1- Greeley
To
Weiland, Inc
Permit Index Doc Type
Hydrology Report
Email Name
MAC
TAK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Peter Wayland <br />Brownwood SWSP <br />December 31, 2012 <br />Page 4of5 <br />beneficial use. The water commissioner and/or the division engineer shall determine the <br />rate and timing of an aggregated release. <br />7. The water attributable to the 0.24 shares of the BTDMC must continue to be diverted In- <br />priority at the ditch then measured back to the Big Thompson River in the vicinity of the <br />Brownwood Pit and up- stream of the Hillsborough Ditch. Adequate measuring devices <br />acceptable to the water commissioner must be installed. <br />8. In the event Loveland plans to use C -BT Project water as a replacement source, <br />Loveland shall comply with the Interim Rule issued by the Northern District in May 2005 <br />regarding the use of C -BT Project water in substitute water supply plans. Prior to the <br />use of the C -BT Project water, Loveland shall notify this office, the division engineer and <br />the water commissioner of the amount of C -ST Project water dedicated to this plan an <br />provide a copy of the Northern District's approval letter as required by paragraph I(g) of <br />the Northern District's May, 2005 Interim Rule. <br />9. The replacement water that is the subject of this plan cannot be sold or leased to any <br />other entity. As a condition of subsequent renewals of this substitute water supply plan, <br />the replacement water must be appurtenant to this site until a plan for augmentation is <br />obtained. All replacement water must be concurrent with depletions in quantity, timing, <br />and locations. <br />12. <br />13. <br />responsible for operation and accounting of finis pran must ua JJrwrucv VII LIIG <br />forms to the division engineer and water commissioner. <br />Approval of this substitute water supply plan does not relieve the Applicant and/or <br />landowner of the requirement to obtain a Water Court decree approving a permanent <br />plan for augmentation or mitigation to ensure the permanent replacement of all <br />depletions, including long -term evaporation losses and lagged depletions after gravel <br />mining operations have ceased. Approval of this plan does not imply approval by this <br />nfnnp of anv related litigation. Renewal of this plan beyond October 2014 is contingent <br />in accordance with the letter dated April 30, 2010 (copy attached) from the Colorado <br />Division of Reclamation, Mining, and Safety ( "DRMS °), all sand and gravel mining <br />operators must comply with the requirements of the Colorado Reclamation Act and the <br />Mineral Rules and Regulations for the protection of water resources. The April 30, 2010 <br />letter from DRMS requires that you provide information to DRMS to demonstrate you <br />can replace long term injurious stream depletions that result from mining related <br />
The URL can be used to link to this page
Your browser does not support the video tag.