Metro Wastewater Reclamation District SPI -14 <br />to the site during the filling operation. Based on the delivery rates provided, it is anticipated that the <br />maximum timeframe between filling operations is approximately two to eight weeks depending on <br />contractor phasing. Based on the Contractor's preliminary schedule, spoils delivery will occur continuously <br />between approximately September 2013 and September 2014. <br />In conclusion, the Metro District believes it will be able to deliver up to 75,000 CY of suitable pipeline spoils <br />to Debetz Pit within the approximate one year duration of construction in which spoils are produced. <br />Depending on contractor means and methods, the total quantity of spoils may be as low as 55,000 CY. It is <br />understood that Adams County Parks & Community Development must obtain a Conditional Use Permit <br />(CUP) from Adams County Planning and a Floodplain Use Permit (FUP) from Adams County Public Works <br />prior to the SPI Contractor beginning spoils delivery to the Debetz Pit site. Should issuance of the CUP or <br />FLIP be delayed beyond the start of SPI construction, the Metro District may deliver spoils elsewhere until <br />such time as the County obtains all necessary permits and issues a written request for spoils delivery in <br />accordance with the terms of the December 2010 IGA. This may reduce the total quantity of spoils <br />delivered to Debetz Pit below the value presented herein. <br />3 <br />