My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-07-23_ENFORCEMENT - C1992080
DRMS
>
Day Forward
>
Enforcement
>
Coal
>
C1992080
>
2013-07-23_ENFORCEMENT - C1992080
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:22:46 PM
Creation date
7/24/2013 7:25:29 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992080
IBM Index Class Name
Enforcement
Doc Date
7/23/2013
Doc Name
Extension Request for NOV Issued 5-23-13 on Abatement due dates
From
Oakridge Energy, Inc.
To
DRMS
Violation No.
CV2013005
Email Name
MLT
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C,-lgga • Oslo <br />RECEIVED OAKRIDGE ENERGY, INC. <br />4613 OLD JACKSBORO HIGHWAY <br />JUL 2 3 2013 WICHITA FALLS, TEXAS 76302 <br />DIVISION OF RECLAMATION PHONE (940) 322 -4772 <br />MAVIN(3AND SAFETY FAX (940) 322 -9452 <br />chipriccl8 L6,ynail.com <br />July 17, 2013 <br />Division of Reclamation, Mining and Safety <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />Re: Carbon Junction Mine, La Plata County Notice of Violation No CV- 2013 -005. <br />Dear Ms. Talvitie, <br />In regards to the Notice of Violation issued on May 23, 2013 following the U.S. Department of <br />Interior Office of Surface Mining inspection, Oakridge Energy, Inc. is requesting an extension <br />from the Colorado Division of Reclamation, Mining and Safety until August 9, 2013 to meet the <br />requirement for the Abatement due dates listed in the Schedule to Notice of Violation as follows: <br />Abatement Step #1 <br />Submission of a Technical Revision to the permit that accurately represents the as-built <br />configuration of the Carbon Junction Permanent Diversion, with supporting design details <br />per Rule 4.05.3 along with an updated, accurate, post- mining topography and mapping for <br />the entire permit area and a map delineating the Carbon Junction drainage area by August <br />9, 2013 as the work is in progress to meet these requirements and can be completed and <br />submitted for your approval at this time. <br />Abatement Step #2 <br />Submission of a Technical Revision to the permit that presents designs and plans for <br />reestablishment of the Upper Carbon Junction Channel, and reclamation and stabilization <br />of the Carbon Junction Temporary Diversion and gully erosion by August 9, 2013 and the <br />work is in progress to meet these requirements and can be completed and submitted for <br />your approval at this time. <br />RECEIVED <br />JUL 2 3 2013 <br />DIVISION OF RECLAMATION <br />MINING AND SAFETY <br />
The URL can be used to link to this page
Your browser does not support the video tag.